Off-plan homes handing over in 2027: what buyers should check now

A quarter-by-quarter plan for Dubai off-plan buyers with a 2027 handover: checking construction progress on Dubai REST, reading the completion notice, timing the final payment and a mortgage, snagging, DEWA, service charges, the title deed, what the law says about delays, and renting or reselling at handover.

OffPlan Insider ResearchWritten and reviewed by the research desk
Published 23 Nov 202618 min read17 sources cited
The short answer

If your Dubai off-plan home is due in 2027, start now. Check progress on Dubai REST monthly, find your latest contractual date in the SPA, and arrange the balance or a mortgage, capped at 50% off-plan, about six months ahead. Budget for title deed and DEWA fees, snag before signing, and decide whether to live in, let or resell.

Key takeaways

  1. Your handover date is the SPA's anticipated completion date plus its grace period. A quarter given in a brochure is a target, not a deadline.
  2. Check the project's status and completion percentage on the Dubai Land Department's Project Status service each month. It is free on the DLD website and the Dubai REST app.
  3. Plan backwards from your quarter: decide whether to live in, let or resell about nine months ahead, have mortgage approval and any power of attorney about six months ahead, and funds ready three months ahead.
  4. Budget the official handover costs as of November 2026: AED 250 for the title deed, AED 140 in map, knowledge and innovation fees, a DEWA deposit of AED 2,000 for a flat or AED 4,000 for a villa and AED 155 activation. No second 4% DLD fee is due.
  5. The Central Bank caps a mortgage on property bought off-plan at 50% of value, and the 0.25% mortgage registration fee and the DLD fee are paid in cash.
  6. After handover the developer must fix defective installations for one year and structural defects for ten years from the completion certificate, under Article 40 of Law No. 6 of 2019.
  7. Dubai's off-plan laws set no standard penalty for late handover. What you can claim starts with your SPA's delay clause, and RERA can cancel a project only on the grounds in the 2010 bylaw.

01Why plan a 2027 handover now?

Many Dubai off-plan homes are scheduled for completion in 2027. If yours is one of them, the year ahead is when the decisions that cost or save money are made: how you will pay the balance, whether you will live in, let or sell, and how you will spot a delay early.

Most of the work happens before the handover notice arrives, not after. A buyer who waits for the notice often has only a short window to raise a mortgage, arrange a power of attorney and book an inspection.

This guide is a planning calendar for 2027, quarter by quarter. The step-by-step process on the day itself is in our off-plan handover guide, and every project with a published 2027 handover is listed on our 2027 handover page. Everything here is accurate as of November 2026.

02Which off-plan projects are handing over in 2027?

The table below lists the off-plan projects we track with a 2027 handover, earliest first. It refreshes when projects are added or dates change, and sold-out projects are left out.

125 off-plan projects with a 2027 handover on OffPlan Insider, November 2026, earliest handover first, first 30 shown. See every 2027 handover. Sold-out projects are left out. Handover dates are the developer's and can move.
ProjectAreaDeveloperFromPayment planHandover
Haya on the Park by NshamaTown SquareNshamaOn request10/10/10/10/10/10/40Feb 2027
Binghatti AquariseBusiness BayBinghatti DevelopersAED 2M20/50/30Q1 2027
Cotier House by ImtiazDubai IslandsImtiaz DevelopmentsOn requestOn requestQ1 2027
Cove by ImtiazDubailand Residence ComplexImtiaz DevelopmentsOn request60/40Q1 2027
Delvara Residence, JVCJumeirah Village CircleCavara DevelopmentOn requestOn requestQ1 2027
Golf Greens at DAMAC HillsDubailandDAMAC PropertiesAED 1.87MOn requestQ1 2027
Oceanz by DanubeDubai Maritime CityDanube PropertiesAED 1.2MOn requestQ1 2027
Palm Beach TowersPalm JumeirahNakheelOn requestOn requestQ1 2027
Pristine by ZoyaAl FurjanZoya DevelopmentsOn requestOn requestQ1 2027
Samana Mykonos SignatureArjanSamana DevelopersAED 998KOn requestQ1 2027
Samana WavesJumeirah Village CircleSamana DevelopersAED 476KOn requestQ1 2027
Elitz 3 by DanubeJumeirah Village CircleDanube PropertiesAED 1.26MOn requestApr 2027
Sportz by DanubeDubai Sports CityDanube PropertiesAED 1.45MOn requestMay 2027
Al Waha Residences 2Dubai SouthExpo City DubaiAED 1.89M10/40/50Q2 2027
Asayel AvenueMirdifDubai Investment Real EstateOn requestOn requestQ2 2027
Autograph Collection at DAMAC HillsDubailandDAMAC PropertiesOn requestOn requestQ2 2027
Beach Walk 4 by ImtiazDubai IslandsImtiaz DevelopmentsOn request20/40/40Q2 2027
Burj Binghatti Jacob & Co ResidencesBusiness BayBinghatti DevelopersAED 8.4M20/50/30Jun 2027
Canal Heights de GRISOGONO by DAMACBusiness BayDAMAC PropertiesAED 12.46MOn requestQ2 2027
CelesteAl JaddafHRE DevelopmentOn request20/10/10/10/50Q2 2027
Chic Tower by DAMACBusiness BayDAMAC PropertiesAED 4.71MOn requestQ2 2027
Courtyard OneDubai SouthGolden Light Real Estate DevelopmentsAED 1.09M20/20/30/30Q2 2027
Eleve by DeyaarDowntown Jebel AliDeyaarOn request10/48/12/30Q2 2027
Fashionz by DanubeJumeirah Village Triangle (JVT)Danube PropertiesAED 960K10/10/10/70Jun 2027
Franck Muller AeternitasDubai MarinaLondon GateOn request40/60Q2 2027
Gharbi II ResidencesJumeirah Village CircleRabdan DevelopmentsAED 1.62M20/40/10/30Q2 2027
Harbour Lights by DAMACDubai Maritime CityDAMAC PropertiesAED 6.67M20/80Q2 2027
Lagoon Views at DAMAC LagoonsDubailandDAMAC PropertiesAED 1.63M20/50/30Q2 2027
Miorah by ZoyaDubai SouthZoya DevelopmentsOn requestOn requestQ2 2027
Mira Villas designed by Bentley HomeMohammed Bin Rashid CityMira DevelopmentsAED 27.21M50/50Q2 2027

Handover dates are the developer's and can move. Treat a quarter in a brochure as a target, and check your own date in your sale and purchase agreement (SPA). For homes completing even sooner, see projects near handover.

03Step one: find your real handover date

Your SPA usually gives an anticipated completion date, often as a month or a quarter. It also usually adds a grace period, and lists events that can extend the timetable, such as force majeure.

Your latest contractual date is the anticipated date plus the grace period plus any extension validly claimed. Only after that date is the developer late in the legal sense. Our guide to handover delays works through the arithmetic with an example.

Write three dates down now: the anticipated date, the end of the grace period and the latest date the contract allows. Every other step in this guide works back from the first, while your rights in a delay run from the last.

A worked example

Suppose your SPA gives an anticipated completion date of 31 March 2027 and a grace period of six months. The developer can complete at any point up to 30 September 2027 without being in breach.

You should still plan for March, because the developer can complete early within the contract. If the notice arrives in March and you planned for September, you may have only weeks to find the balance.

04A countdown to your 2027 handover

The simplest way to plan is to count back from the anticipated date. The checkpoints below are a planning guide built on how the handover process works, not legal deadlines.

A countdown to a 2027 Dubai off-plan handover in seven checkpoints. Twelve months before: fix your dates from the SPA completion date and grace period and start monthly Project Status checks on Dubai REST. Nine months before: choose to live in, rent or resell, noting a resale before handover needs the developer's NOC and paid-in threshold. Six months before: line up mortgage talks within the 50% off-plan cap and a power of attorney if abroad. Three months before: funds in place, documents to hand and a snagging inspection pencilled in. The notice: completion certificate then handover notice, checked against the SPA. Handover day: sign with the defects list attached and open DEWA and any district cooling account. First year: title deed, defects reported in writing, service charges through Mollak and Ejari if you let.
Work back from your anticipated completion date. The months are a planning guide, not legal deadlines.
Checkpoint What to do
12 months before Confirm your dates from the SPA. Start monthly progress checks on Dubai REST. Check your contact details with the developer
9 months before Decide whether you will live in, let or resell. If reselling before handover, ask the developer for its NOC rules in writing
6 months before Speak to lenders if you will borrow. Sign a power of attorney if you will be abroad at handover
3 months before Have the balance ready. Gather documents. Book a snagging inspection provisionally
The notice Check the final statement against your SPA and receipts. Pay by the deadline. Inspect
Handover day Sign with your defects list attached. Read the meters. Collect keys and access cards
First 12 months Follow the title deed, report defects in writing, pay service charges, register any lease on Ejari

05Your 2027 handover, quarter by quarter

Because today is November 2026, some of those checkpoints have already arrived for early-2027 projects. The calendar below turns the countdown into dates for each quarter of 2027.

A planning grid for Dubai off-plan homes handing over in Q1, Q2, Q3 or Q4 2027. Track progress monthly: now for every quarter. Decide whether to live in, rent or resell: now for Q1, Q2 and Q3, Q1 2027 for Q4. Have mortgage and power of attorney in hand: now for Q1 and Q2, Q1 2027 for Q3, Q2 2027 for Q4. Funds ready and snagging booked: now for Q1, then Q1, Q2 and Q3 2027. The one-year installations defects cover ends in Q1 to Q4 2028, and the 5% escrow retention is released to the developer from Q1 to Q4 2028 at the earliest.
Find your handover quarter, then read down the column. NOW means the checkpoint is this quarter or has passed.

Handover in Q1 2027 (January to March)

Every checkpoint before the notice is already here. Confirm with the developer in writing whether the project is on course for the quarter, and check the completion percentage on Dubai REST this month.

If you are borrowing, apply now: a bank needs time to value the unit and approve your income. Have the balance and the fees ready, and sign any power of attorney before the end of the year if you will be abroad.

Handover in Q2 2027 (April to June)

Decide now whether you will live in, let or resell, because a resale before handover takes time to arrange. Start mortgage conversations this quarter and line up a power of attorney if you need one.

By January 2027 the balance should be in place and a snagging company pencilled in. Keep the monthly progress checks going.

Handover in Q3 2027 (July to September)

Use the next few weeks to decide your plan for the home, and keep checking progress monthly. Mortgage approval and any power of attorney belong in Q1 2027.

By April 2027 have the funds ready. This is also a good quarter to look at the building's management arrangements and estimated service charges, which our service charges guide explains.

Handover in Q4 2027 (October to December)

You have the most time, but a late-2027 date is also the most likely to move. Track progress monthly and keep a note of each figure and date.

Decide your plan by Q1 2027, sort your mortgage and paperwork in Q2, and have funds ready in Q3. If the project slips into 2028, the same calendar simply shifts.

06How do I check construction progress?

You do not need to rely on updates from an agent or a sales team. The Dubai Land Department's Project Status service shows the official status and completion percentage of any registered project.

  1. Open the service. It is on the DLD website and in the Dubai REST app, under the real estate project status enquiry.
  2. Search for the project. Enter the project number, the land number or the project name. The project number is on your Oqood certificate.
  3. Read the result. It shows the project's details and completion percentage. There is no fee.
  4. Log it monthly. Write down the percentage and the date. A steady climb means work is moving. A figure that stays the same for several months is worth raising with the developer in writing.

The completion percentage is confirmed by a technical report from a RERA-approved consultant after a site inspection, under Article 17 of Executive Council Resolution No. 6 of 2010. DLD's published answers say a buyer can also ask for a formal completion-percentage report from a RERA technical auditor, for a fee of AED 15,000 per unit.

The same checks are useful when comparing a new purchase. Our guide to checking an off-plan project and developer shows what else to look at.

What a monthly log looks like

Here is an illustration. A buyer with a Q3 2027 handover notes 62% in September 2026, 66% in October and 70% in November. Work is moving at about four points a month, which is consistent with completion in the second half of 2027.

If the same buyer saw 70% in November, December and January, they would ask the developer in writing for an updated timetable. They would keep paying milestone instalments, as the escrow rules link payments to progress, rather than stopping on their own.

07What do the completion certificate and the handover notice mean?

Handover starts when the building receives its completion certificate. Article 8 of Law No. 13 of 2008 then requires the developer to register the completed project in the Property Register, with each unit in the name of the buyer who has met their obligations.

The developer then sends you a handover notice. It normally sets out the balance due, the handover charges, the documents needed and the deadline to pay and take possession, on the terms in your SPA.

Read the notice against your contract and your receipts before you pay anything. Check the unit number, the final area, any area adjustment, the amount already paid and every charge listed.

If the final measured area differs from the SPA, the price adjustment follows the area clause in your contract. Ask for the measurement survey if the change is material.

08The final payment: cash, mortgage or post-handover plan

Most 2027 buyers pay the handover instalment in one of three ways. Which one fits depends on your payment plan and your timetable.

Route How it works What to prepare
Cash You pay the balance into the project's escrow account by the notice deadline Have funds in a UAE account in time, and allow for transfer times from abroad
Mortgage A bank lends against the unit at handover, after valuing it Pre-approval before the notice, a cash budget for fees, and any gap if the valuation is low
Post-handover plan Part of the price is paid to the developer in instalments after the keys Budget the instalments alongside service charges and utilities from day one

On a 60/40 plan, 40% falls due at handover. On a post-handover plan, a smaller handover payment is followed by instalments; our post-handover payment plans guide explains why the title deed usually waits for the last of them.

Timing a mortgage for 2027

The Central Bank's mortgage regulations cap lending on property bought off-plan at 50% of value, for every type of buyer. Most buyers therefore pay the construction instalments themselves and borrow for the handover payment. Our off-plan mortgage guide covers the rules in full.

The regulations also limit your total debt repayments to 50% of income and the term to 25 years. The bank values the unit and checks your income when it lends, not when you booked, so a 2027 loan is assessed on 2027 numbers.

Fees are paid in cash. DLD charges 0.25% of the loan to register a mortgage, plus AED 250 for the title deed and AED 10 each in knowledge and innovation fees. Our mortgage registration fee guide has worked figures.

A worked example

Suppose a unit is priced at AED 1,600,000 on a 60/40 plan, so AED 640,000 falls due at handover. A 50% cap would allow up to AED 800,000, so the handover payment fits inside it if the valuation matches the price.

Mortgage registration on a AED 640,000 loan is AED 1,600 at 0.25%, plus the fixed DLD fees, valuation and the bank's own charges. The figures are an illustration only; your bank and the valuation set the real ones.

If you cannot pay at handover

Tell the developer early and ask about options in writing. If the payment stays unpaid, Law No. 19 of 2020 requires the developer to notify DLD, which gives you 30 days' written notice before the developer can act.

A completed project is above 80% built, so the developer may then keep the contract and claim the balance, ask for the unit to be sold at auction, or terminate and keep up to 40% of the price. Our guide to missed off-plan instalments explains each option.

09What does a 2027 handover cost?

The final instalment is the large number. Around it sit a set of smaller official fees and deposits that you should have in cash before the notice arrives.

The cash a 2027 Dubai off-plan handover asks for, as of November 2026. Final instalment: per the SPA, for example 40% on a 60/40 plan. Title deed certificate: AED 250. Map, knowledge and innovation fees: AED 140, made up of AED 120 for the map and AED 10 each. Second 4% DLD fee: AED 0, as it is paid once at Oqood registration. DEWA security deposit: AED 2,000 for a flat or AED 4,000 for a villa, refundable. DEWA activation charges: AED 155 for a small-meter home. Mortgage registration if you borrow: 0.25% of the loan plus AED 250, AED 10 and AED 10. Service charge, district cooling, gas and developer administration charges: on request.
Official fees as of November 2026. Your handover notice gives the final statement for your unit.
Item Amount Paid to
Handover instalment Set by your payment plan Developer, into the project escrow account
Title deed certificate AED 250 Dubai Land Department, usually through the developer
Map fee AED 120 Dubai Land Department
Knowledge and innovation fees AED 10 each Dubai Land Department
4% DLD fee Not charged again Paid once when the sale was registered on Oqood
DEWA security deposit AED 2,000 flat, AED 4,000 villa, refundable DEWA
DEWA activation charges AED 155 DEWA
Mortgage registration 0.25% of the loan plus fixed fees Dubai Land Department
First service charge Based on the RERA-approved budget The building's service charge account
District cooling, gas, admin charges On request The provider or developer

The 4% DLD fee is set by Executive Council Resolution No. 30 of 2013 and is paid once, when the developer registers the sale. Converting the Oqood to a title deed costs only the small issuance fees.

10Snagging: book it in time

Snagging is the inspection of the finished home for defects before you accept it. No law requires it, but a written list made before you sign is the clearest record that the problems were there when the developer handed over.

For a 2027 handover, pencil in a snagging company about three months ahead, or plan to do it yourself with a checklist. The room-by-room tests are in our snagging guide.

Under Article 40 of Law No. 6 of 2019, the developer is liable for defective installations, such as electrical, mechanical and plumbing works, for one year from handover. It is liable for structural defects for ten years from the completion certificate, and an agreement that cuts those periods is void.

If you delay taking possession, the one-year period runs from the completion certificate rather than from the day you take the keys. A late handover by you shortens your own cover.

11DEWA, cooling and the move-in week

Electricity and water come from DEWA. An owner applies for Move-in on the DEWA website or app, uploading the title deed or SPA, and pays a refundable deposit of AED 2,000 for a flat or AED 4,000 for a villa plus AED 155 in activation charges.

DEWA connects supply within 15 working hours of payment. A tenant's account opens through Ejari instead, so if you will let the home, the tenant handles it.

District cooling, piped gas and internet are separate accounts with their own providers and deposits. Ask the developer which providers serve your building before handover week. Our DEWA connection guide covers the order of steps.

Start home insurance on the day you take the keys. The building's policy, paid through the service charge, does not cover your belongings or your own liability inside the unit.

12Service charges start at handover

Service charges pay for the common parts of a building or community. Under Law No. 6 of 2019 a management company cannot collect them until RERA approves the budget, and payments run through DLD's Mollak system.

A building under construction has no approved budget, so any figure quoted at launch is an estimate. Once your building is complete, check the approved rate on DLD's Service Charge Index and multiply it by the area in your title deed.

The owner pays from handover, and letting the home does not move the liability to a tenant. Unpaid charges are a lien on the unit and block a sale until they are settled.

13The title deed after a 2027 handover

An off-plan buyer holds an Oqood registration, not a title deed. Once the completion certificate is issued, the developer must enter the project in the Property Register, and units are registered in the names of buyers who have met their obligations.

Deeds are issued electronically, with an electronic map, and you can verify yours in the Dubai REST app. Under Article 24 of Law No. 7 of 2006 the deed is the evidence of ownership, so follow it up if it has not arrived within a few weeks of handover.

If you are on a post-handover plan, or have a mortgage, ask the developer how and when your deed will be issued. Our title deed guide covers each case.

The escrow law adds a buyer protection that runs past handover. Under Article 14 of Law No. 8 of 2007, 5% of the project account is held back after the completion certificate and released to the developer one year after the units are registered in buyers' names. Our escrow law guide explains the rest.

14What if the 2027 handover is delayed?

A later date than the brochure quarter is not automatically a delay. The developer is late only after the latest contractual date in your SPA, which includes the grace period and any valid extension.

Dubai's off-plan laws, Law No. 13 of 2008 and its implementing bylaw, Executive Council Resolution No. 6 of 2010, and Law No. 8 of 2007 on escrow, set no standard penalty for late handover. Compensation is whatever your SPA's delay clause sets, or what a court or arbitrator awards.

The laws do deal with the serious cases. If RERA cancels a project by a final reasoned decision, or the developer never started work for reasons beyond its control, Article 11(b) of Law No. 13 of 2008, as amended by Law No. 19 of 2020, entitles buyers to a refund of everything paid through the escrow procedure.

Projects that stall after work starts go to the Special Tribunal for Unfinished and Cancelled Real Property Projects, set up by Decree No. 33 of 2020. It can assign completion to another developer or order refunds, and its decisions are final.

What to do if your 2027 date slips

  1. Work out your latest contractual date from the anticipated date, grace period and any extension notice.
  2. Keep your monthly log of the completion percentage on Dubai REST.
  3. Ask the developer in writing for a revised date and keep every reply.
  4. Keep paying milestone instalments unless a DLD-approved consultant confirms a milestone has not been reached. Stopping on your own can trigger the default procedure.
  5. Read the delay clause: the rate, when it starts, the cap and how it is paid.
  6. Take legal advice before stopping payment or starting a claim.

The full legal picture, with worked examples, is in our handover delay guide.

15Move in, rent out or resell?

Deciding what the home is for changes what you prepare. Make the choice about nine months before handover, so the paperwork is ready when the notice arrives.

Three paths for a Dubai off-plan home handed over in 2027. Move in: snag before you sign the handover papers, apply for DEWA Move-in with the title deed or SPA, start contents cover on the day you take the keys, and service charges run from handover. Rent out: register the lease on Ejari for AED 177.75 online, the tenant's DEWA account opens through Ejari, a holiday let needs a DET permit for the home, and the owner still pays the service charge. Resell: before handover it is an assignment with a developer NOC, after the deed it is a normal resale at DLD, a mortgaged unit needs the bank's consent, and unpaid service charges block the transfer.
Each choice changes what you prepare in the months before handover.

Moving in

Plan the move around the handover deadline, not the anticipated date, and allow for snag fixes before furniture arrives. Register with the community management for access cards and any move-in permit, which vary by building.

Renting out at handover

A yearly lease must be registered on Ejari. DLD charges AED 177.75 through the Dubai REST app or its website and AED 220 at a Real Estate Trustee Centre, and registration is possible once the unit is handed over and set up in the system.

Letting by the night is a different regime. Under Decree No. 41 of 2013 each home needs a holiday home permit from the Department of Economy and Tourism, as our holiday homes guide explains. If you will not manage the home yourself, see our property management guide.

Reselling before or after handover

Before handover, a sale is an assignment of your SPA to a new buyer. The developer must issue a no objection certificate, and most require a set share of the price to be paid first. Our guide to selling off-plan before handover covers the process and costs.

After the title deed is issued, the home is sold as a ready resale at DLD, with the 4% transfer fee. A mortgaged unit needs the bank's consent, and the service charge account must be clear.

16Buying abroad? Sort your power of attorney early

You can complete handover from abroad through a representative with a power of attorney. A document signed outside the UAE must be notarised, attested by your foreign ministry and the UAE embassy, then by the UAE Ministry of Foreign Affairs, and translated into Arabic.

That chain takes time, which is why it sits at the six-month checkpoint. DLD treats a power of attorney as valid for two years for a sale or mortgage. Our power of attorney guide has the steps.

17A 2027 handover checklist

  • Write down your anticipated completion date, grace period and latest contractual date.
  • Check the completion percentage on Dubai REST every month and keep a log.
  • Confirm your contact details, email and address with the developer.
  • Decide whether you will live in, let or resell, and get NOC rules in writing if reselling.
  • Speak to lenders about six months ahead if you will borrow, within the 50% off-plan cap.
  • Sign a power of attorney early if you will be abroad.
  • Keep the handover instalment and the cash fees ready three months ahead.
  • Book a snagging inspection or prepare your own checklist.
  • Check the handover notice and final statement against your SPA and receipts.
  • Sign the handover documents with your defects list attached.
  • Open DEWA and any district cooling, gas and internet accounts.
  • Follow up the title deed and report defects in writing within the first year.
  • Pay service charges through Mollak and register any lease on Ejari.

18What the law covers, and what it does not

Covered by law Left to your contract or practice
Registration of the off-plan sale on Oqood, and the deed after completion (Law No. 13 of 2008, Art. 3 and 8) The handover notice period and any deemed-handover clause
Buyer payments into a project escrow account, with 5% held back after completion (Law No. 8 of 2007) The grace period, extension events and delay compensation
A full refund if RERA cancels the project (Law No. 13 of 2008, Art. 11(b)) The paid-in threshold and fees for a resale before handover
The 30-day DLD notice before a developer acts on a buyer default (Law No. 19 of 2020) Developer administration charges at handover
One-year installations and ten-year structural defects cover (Law No. 6 of 2019, Art. 40) Snagging windows and timelines for fixing individual snags
RERA-approved service charge budgets through Mollak (Law No. 6 of 2019) Warranties on finishes such as paint and joinery
The 50% off-plan loan-to-value cap (Central Bank mortgage regulations) A bank's valuation, interest rate and own fees

19Key terms

Term Meaning
Anticipated completion date The date in the SPA when the developer expects to finish. A target, not the deadline
Grace period Extra time after the anticipated date, set by the SPA, before late completion is a breach
Completion certificate The certificate issued when the building is complete. It starts the handover and the ten-year structural cover
Handover notice The developer's notice setting out the balance, charges, documents and deadline
Completion percentage Construction progress confirmed by a RERA-approved consultant and shown on Project Status
Oqood DLD's interim register for off-plan sales, replaced by a title deed after completion
Mollak DLD's system for service charge budgets, invoices and payments
Snagging Inspecting the finished home for defects before accepting it
Assignment Selling your SPA to a new buyer before handover, with the developer's NOC

20Where to go next

ProjectsProjects mentioned in this guide.

FAQQuestions buyers ask.

How do I check if my 2027 off-plan project is on track?

Use the Dubai Land Department's Project Status service on its website or in the Dubai REST app. Search by project number, land number or project name and it shows the project's status and completion percentage at no cost. Note the figure each month: a steady rise means work is moving, while a figure that stops for several months is worth asking the developer about in writing.

When will I get the handover notice for a 2027 project?

No law sets a fixed notice period. The building first needs its completion certificate, and the developer then sends a handover notice with a final statement and a deadline, on the terms set in your sale and purchase agreement. Read your SPA now for the notice period and any clause that treats the unit as handed over if you do not complete in time.

When should I apply for a mortgage for a 2027 handover?

Start talking to lenders about six months before the expected handover and aim for pre-approval before the notice arrives. The Central Bank caps lending on property bought off-plan at 50% of value, and the bank will value the unit and assess your income at the time it lends. The 0.25% mortgage registration fee and other fees are paid in cash.

What costs should I budget for a 2027 handover in Dubai?

Budget for the handover instalment in your payment plan, AED 250 for the title deed certificate plus AED 120 for the map and AED 10 each in knowledge and innovation fees, a refundable DEWA deposit of AED 2,000 for a flat or AED 4,000 for a villa, AED 155 DEWA activation, and the first service charge. No second 4% DLD fee is due.

What happens if my 2027 handover is delayed?

A handover is late only after the anticipated completion date plus the SPA's grace period and any extension it allows. Dubai's off-plan laws set no standard delay penalty, so compensation is whatever the SPA states or a court or arbitrator awards. If RERA cancels a project, Article 11 of Law No. 13 of 2008 entitles buyers to a full refund through escrow.

Can I sell my off-plan unit before the 2027 handover?

Yes, usually by assigning your sale and purchase agreement to a new buyer. The developer must issue a no objection certificate, and most require a set share of the price to be paid first. Decide early: if you plan to sell before handover, the paid-in threshold and the developer's transfer charges need to fit your timetable.

Can I rent out my unit straight after handover in 2027?

Yes, once the unit is handed over and set up in the Dubai Land Department's systems. A yearly lease must be registered on Ejari, which costs AED 177.75 through the Dubai REST app or the DLD website. Letting by the night needs a holiday home permit from the Department of Economy and Tourism instead.

Sources & methodWhere these figures come from.

Sources

  1. Dubai Land Department: Real estate project status enquiry
  2. Dubai Land Department: Issue title deed
  3. Dubai Land Department: Request for mortgage registration
  4. Dubai Land Department: Register renew ejari contract
  5. Dubai Land Department: Service charge index overview
  6. Dubai Land Department: Frequently asked questions
  7. Dubai Legislation Portal: Law No. (13) of 2008
  8. Dubai Legislation Portal: Law No. (19) of 2020 Amending Law No. (13) of 2008 Regulating the Interim Real Property Register in the Emirate of Dubai
  9. Dubai Legislation Portal: Executive Council Resolution No. (6) of 2010 Approving the Implementing Bylaw of Law No. (13) of 2008
  10. Dubai Legislation Portal: Law No. (8) of 2007
  11. Dubai Legislation Portal: Law No. (6) of 2019 Concerning Ownership of Jointly Owned Real Property in the Emirate of Dubai
  12. Dubai Legislation Portal: Law No. (7) of 2006
  13. Dubai Legislation Portal: Decree No. (33) of 2020 Concerning the Special Tribunal
  14. Dubai Legislation Portal: Decree No. (41) of 2013
  15. Dubai Legislation Portal: ECR 30 of 2013
  16. dewa.gov.ae: Move in
  17. Central Bank of the UAE Rulebook: Regulations regarding mortgage loans

What we could not verify

  • The 12, 9, 6 and 3 month checkpoints and the quarter-by-quarter calendar are a planning guide, not legal deadlines; notice periods, deemed-handover clauses and snagging windows are set by each sale and purchase agreement.
  • Grace periods, delay compensation and the paid-in threshold for a resale before handover are contract terms that vary by developer, so the guide gives no standard figure for them.
  • DEWA's Move-in page refused automated access on 23 November 2026; the AED 2,000 and AED 4,000 deposits and AED 155 activation charges are restated from our DEWA guide, checked on DEWA's site on 20 November 2026.

23 Nov 2026 · Reviewed by OffPlan Insider Research. First published 23 Nov 2026, updated 24 Nov 2026.

Want options that fit your budget?

Tell us your budget and what the property is for. We check live prices, plans and availability with the developers and send the options that fit.

  1. Share your budgetAnd what the property is for
  2. We check with developersPrices, plans and availability
  3. You reserve directBooking and SPA are with the developer

No consultation fee · You book directly with the developer