As of November 2026, the officially dated 2027 milestones are Etihad Rail's Sharjah University City station on 30 March 2027, the second runway at Al Maktoum International by the end of 2027, a Dubai to Ras Al Khaimah air taxi route, the Metro Gold Line contract award, Skylight Mall and The Yard, Horizon English School Town Square in August 2027 and two healthcare expansions. The Blue Line keeps building for its 9 September 2029 opening.
Key takeaways
- Etihad Rail's Sharjah station at University City is due on 30 March 2027. Dubai's station at Al Yalayis, beside Jumeirah Golf Estates, has been open since 30 September 2026.
- Dubai Airports says the second runway at Al Maktoum International (DWC) opens by the end of 2027. The airport's main operations begin in 2032, as the Dubai Media Office stated in June 2026.
- Ras Al Khaimah's transport authority, Joby and Skyports target 2027 for an air taxi service starting with a Dubai to Ras Al Khaimah corridor, with the first vertiport on Al Marjan Island. Dubai's own four-vertiport network was targeted for 2026.
- The Metro Blue Line builds through 2027 and opens on 9 September 2029. The Gold Line's contract is due to be awarded in 2027, with opening on 9 September 2032.
- The RTA's 2025-2027 plan covers 57 road projects, 226 km of roads and 115 bridges and tunnels. Al Meydan Street and Latifa bint Hamdan Street are due by the end of 2028, not 2027.
- Skylight Mall on Al Khail Road and The Yard on Palm Jebel Ali are due in 2027, Horizon English School Town Square in August 2027, and the Mediclinic Parkview expansion and IBN SINA+ in Dubai Healthcare City in 2027.
- The Dubai Loop has durations rather than dates, so no opening year can be given yet.
- Line each date up with your handover date, check where the station, road or school actually is, and price a home on comparable sales rather than on a promised project.
If you are buying off-plan with a handover in 2027 or 2028, the projects that open around your home in the same year matter as much as the building itself. This guide lists what is officially dated for 2027 across Dubai and the wider UAE, what keeps building through 2027 and opens later, and which communities each project serves.
Everything here is as of November 2026 and comes from the RTA, the Dubai Media Office, Etihad Rail, Dubai Airports, the Ras Al Khaimah Transport Authority, KHDA or the operator itself. Where an official date does not exist, we say so rather than guess.
Jump to: the 2027 calendar, air taxis, Etihad Rail, Al Maktoum airport, the Metro, the Dubai Loop, roads, malls, schools and hospitals, areas served, buyer checklist.
01What infrastructure is officially due in 2027?
Ten items have a stated 2027 date or milestone. The biggest for daily life are Etihad Rail's Sharjah station on 30 March 2027 and the second runway at Al Maktoum International by the end of 2027. The others are an air taxi route to Ras Al Khaimah, two new malls, a school, two healthcare projects and the RTA's road plan.
Several of Dubai's best-known projects are missing from that list on purpose. The Metro Blue Line opens in 2029, the Gold Line in 2032 and Al Maktoum's new terminal in 2032. The Dubai Loop has no calendar date at all. They still matter in 2027, because that is when much of their construction happens.
02How did we decide what counts as due in 2027?
We counted a project only when an official source gave a 2027 date or a 2027 milestone. A developer brochure, a press estimate or a social media post did not count. Where two official statements differ, we give both.
Three kinds of date appear below, and they are not equally firm:
- A day. For example, 30 March 2027 for Etihad Rail's Sharjah station. These are the most precise, though they can still move.
- A month or a part of the year. For example, August 2027 for a school or the end of 2027 for a runway.
- A year only. For example, Skylight Mall in 2027. That can mean January or December.
A year alone tells you little about your first months in a new home. If your handover is in early 2027, a mall "due in 2027" may well open after you move in.
03When do air taxis start in Dubai and Ras Al Khaimah?
There are two separate air taxi plans. Dubai's city network, run with the RTA, was officially targeted for 2026. A Dubai to Ras Al Khaimah route, agreed by Ras Al Khaimah's transport authority, is targeted for 2027.
Dubai's four-vertiport network
The RTA is building the network with Joby Aviation, which flies the electric aircraft, and Skyports Infrastructure, which builds and runs the vertiports. In November 2025 the Dubai Media Office said Joby expected to begin carrying passengers in 2026, after the first crewed flight between two points in the UAE, from Margham to Al Maktoum International.
Four vertiports are planned for the first network:
| Vertiport | Where | Nearest area pages |
|---|---|---|
| DXB | Beside Dubai International Airport, built by Skyports | Deira and the airport district |
| Dubai Mall | Zabeel parking area of Dubai Mall, operated by Emaar | Downtown Dubai, Business Bay |
| Palm Jumeirah | At Atlantis The Royal | Palm Jumeirah |
| Dubai Marina | American University in Dubai parking area, managed by Wasl | Dubai Marina |
The RTA gives a trip from DXB to Palm Jumeirah as about 10 minutes, against about 45 minutes by car. The service starts with a small number of aircraft, so think of it as an airport link for a few areas, not a commute.
The latest official timing for the Dubai network is 2026. We give no 2027 date for it, because none has been officially stated. Check the RTA's announcements for the start date before letting it shape a decision.
Dubai to Ras Al Khaimah
On 29 September 2025 the Ras Al Khaimah Transport Authority (RAKTA), Joby and Skyports signed a memorandum of understanding to launch an air taxi service in Ras Al Khaimah in 2027. It starts with a corridor between Dubai and Ras Al Khaimah, followed by a network inside the emirate.
The first vertiport is on Al Marjan Island, with Jebel Jais named as a destination. RAKTA says the trip from Dubai International Airport to Al Marjan Island takes well over an hour by car and could take less than 15 minutes by air taxi.
The island is also where Wynn Al Marjan Island is scheduled to open in 2027. These are the projects on sale on Al Marjan Island that we track:
| Project | Developer | Homes | From | Payment plan | Handover | Status |
|---|---|---|---|---|---|---|
| Aqua Maya | BNW Developments | Apartment | AED 1.78M | 10/40/50 | Q4 2027 | Selling |
| La Perla | BNW Developments | Apartment · Duplex · Penthouse | AED 2.16M | 10/40/50 | Q4 2027 | Selling |
| Mondrian Al Marjan Island Beach Residences | ELEVATE | Apartment · Branded residence · Penthouse · Townhouse · Villa | On request | On request | Dec 2028 | Selling |
| Vienna House Residences by Wyndham | Sugee Group | Apartment · Penthouse · Branded residence | On request | On request | Q4 2027 | New launch |
| JW Marriott Residences Al Marjan Island | WOW Resorts | Apartment · Duplex · Penthouse · Branded residence | On request | 20/50/30 | On request | Selling |
| W Residences Al Marjan Island | Dalands Holding | Apartment · Duplex · Branded residence | AED 4.06M | 20/50/30 | Q4 2027 | Selling |
| Address Residences Al Marjan Island | Emaar Properties | Apartment · Townhouse · Penthouse · Branded residence | AED 8.48M | 10/70/20 | Sep 2028 | Under construction |
| Shoreline by DAMAC | DAMAC Properties | Apartment · Townhouse | AED 4.53M | On request | Jul 2028 | Selling |
| Island Heights by Range Developments | Range Developments | Apartment | On request | On request | On request | Selling |
| La Mazzoni by The Luxe Developers | The Luxe Developers | Apartment · Duplex · Penthouse | AED 2.1M | 5/55/40 | Q4 2028 | Selling |
| Dolce Residences by Wyndham | BNW Developments | Branded residence | On request | On request | Q4 2028 | Pre-launch |
| Janu Residences, Al Marjan Island | Marjan | Branded residence · Apartment · Villa | On request | On request | 2029 | Pre-launch |
| Ardee Views | Ardee Developments | Apartment · Penthouse · Townhouse | On request | On request | On request | Pre-launch |
| Taj Wellington Mews | BNW Developments | Apartment · Branded residence · Serviced apartment | AED 1.5M | 10/50/40 | Q1 2028 | Selling |
| FashionTV Acacia | BNW Developments | Apartment · Penthouse · Branded residence | AED 1.96M | 10/40/50 | Q2 2028 | Selling |
| Miraggio | Source of Fate | Apartment | On request | 5/5/5/5/40/40 | On request | Selling |
| Palazzo Tissoli | Tissoli Luxury Developers | Apartment · Branded residence | On request | On request | On request | Selling |
| The Residences at Sheraton Al Marjan Island Resort | Atara Development | Branded residence · Apartment | AED 2M | 30/70 | Q2 2029 | Under construction |
| Soléva Beach Residences | Al Huzaifa Properties | Apartment | On request | On request | Q4 2027 | Selling |
| Fairmont Residences Al Marjan Island | Ardee Developments | Apartment · Townhouse · Villa · Branded residence | On request | On request | Q4 2028 | Under construction |
04When does Etihad Rail reach Sharjah city?
Etihad Rail's Sharjah station at University City is due to open on 30 March 2027. It follows the Al Dhafra stations in Abu Dhabi and is the next big addition for buyers in the northern emirates.
Passenger trains have run since 2026. Abu Dhabi and Fujairah opened on 30 June 2026, and the Dubai station at Al Yalayis and Al Dhaid in Sharjah opened with the official launch on 30 September 2026. Madinat Zayed and Liwa are due on 30 November 2026. Our Etihad Rail passenger guide covers routes, fares and journey times in full.
Which communities the 2027 station serves
Etihad Rail names the station by its location, University City in Sharjah. The nearest of our area pages are Muwaileh and Aljada, both off University City Road; that is our mapping by location, not Etihad Rail's.
In Dubai, the station at Al Yalayis sits beside Jumeirah Golf Estates, linked to the Jumeirah Golf Estates Metro station on the Red Line by a 375-metre bridge. Etihad Rail gives Abu Dhabi to Dubai as 57 minutes. See also our Al Yalayis page.
Here are the projects we track in Aljada:
| Project | Developer | Homes | From | Payment plan | Handover | Status |
|---|---|---|---|---|---|---|
| Jenna 1 at Aljada | Arada | Apartment | AED 899K | 5/30/65 | Q1 2029 | Selling |
| Nesba 1 at Aljada | Arada | Apartment | On request | On request | Q2 2028 | Under construction |
| Nesba 2 at Aljada | Arada | Apartment | AED 1.24M | On request | Q2 2028 | Under construction |
| Nesba 3 at Aljada | Arada | Apartment | AED 906K | 5/40/55 | Q2 2028 | Under construction |
| Safa 1 at Aljada | Arada | Apartment | AED 976K | 5/30/65 | Q2 2028 | Under construction |
| Safa Parkview at Aljada | Arada | Apartment | AED 998K | 5/30/65 | Q2 2028 | Under construction |
| The Gate 3 at Aljada | Arada | Apartment | AED 1.23M | 5/30/65 | Q2 2028 | Under construction |
| The Gate 4 at Aljada | Arada | Apartment | AED 985K | 5/30/65 | Q2 2028 | Under construction |
| The Gate 5 at Aljada | Arada | Apartment | On request | 5/35/60 | Q2 2028 | Under construction |
| The Gate 6 at Aljada | Arada | Apartment | AED 970K | 5/30/65 | Q2 2028 | Under construction |
05What happens at Al Maktoum International in 2027?
The second runway at Al Maktoum International (DWC) is due by the end of 2027. In September 2026 the chief executive of Dubai Airports called it the airport's next major infrastructure milestone, and said flydubai could move five or six aircraft to DWC as early as 2027.
That is not the airport's main opening. Dubai approved an AED 128 billion passenger terminal in April 2024, planned for 150 million passengers a year in its first phase. In June 2026 the Dubai Media Office said the project remains on course to begin operations in 2032, and that the move from Dubai International will be phased as capacity becomes available.
The airport sits inside Dubai South. Dubai Investments Park, Jumeirah Golf Estates and Al Furjan are further out. Our Al Maktoum International expansion guide has the distances and the full timeline.
These are the Dubai South projects we track:
| Project | Developer | Homes | From | Payment plan | Handover | Status |
|---|---|---|---|---|---|---|
| One By Preston | Preston Development | Apartment | On request | On request | Q4 2027 | Selling |
| Dana at Expo Valley Views | Expo City Dubai | Apartment | AED 2.57M | 10/60/5/25 | 31 Oct 2029 | Pre-launch |
| Expo Valley Views | Expo City Dubai | Apartment | AED 1.59M | On request | 31 Oct 2029 | Selling |
| Ghadeer at Expo Valley Views | Expo City Dubai | Apartment | AED 1.59M | 10/59/6/25 | 31 Oct 2029 | Selling |
| Mahra at Expo Valley Views | Expo City Dubai | Apartment | AED 1.64M | 10/65/25 | 31 Oct 2029 | Selling |
| Roudah at Expo Valley Views | Expo City Dubai | Apartment | AED 1.69M | 10/10/7.5/7.5/7.5/7.5/7.5/7.5/10/7.5/7.5/10 | 31 Oct 2029 | Selling |
| Ruba at Expo Valley Views | Expo City Dubai | Apartment | AED 1.59M | 10/10/5/5/5/5/5/5/5/5/5/5/5/5/5/5/5/5 | 31 Oct 2029 | New launch |
| Aristo by OKSA | OKSA Developer | Apartment | On request | 5/15/30/50 | On request | Selling |
| Courtyard One | Golden Light Real Estate Developments | Apartment | AED 1.09M | 20/20/30/30 | Q2 2027 | Selling |
| Ramada Residences by Lincoln | Lincoln Star Group | Apartment · Branded residence | On request | On request | Dec 2027 | Selling |
| Maha Villas | Expo City Dubai | Villa | AED 13M | On request | Mar 2026 | Ready |
| Samana South Haven 2 | Samana Developers | Apartment | AED 644K | On request | On request | New launch |
| Tessera | Al Ghurair Development | Apartment · Duplex | AED 2.1M | 35/65 | Q2 2028 | New launch |
| X11 by BAMX | BAMX Developments | Apartment | AED 920K | On request | Q4 2028 | New launch |
| Al Waha Residences 2 | Expo City Dubai | Apartment · Duplex | AED 1.89M | 10/40/50 | Q2 2027 | Selling |
| Arché Residence | Evera Development | Apartment | AED 991K | 20/10/70 | Jun 2028 | New launch |
| Azizi Venice 6 | Azizi Developments | Apartment | AED 705K | 10/10/10/10/60 | On request | Selling |
| Coventry 49 | GFS Developments | Apartment | AED 633K | 20/24/20/36 | Q2 2028 | Selling |
| Fairway Villas 2 at Emaar South | Emaar Properties | Villa | AED 3.2M | On request | On request | Selling |
| Fairway Villas 3 at Emaar South | Emaar Properties | Villa | AED 4.39M | On request | On request | Selling |
06What happens on the Dubai Metro in 2027?
Neither new Metro line opens in 2027. The Blue Line builds through the year and opens on 9 September 2029. The Gold Line's main construction contract is due to be awarded in 2027, ahead of a 9 September 2032 opening.
Blue Line: a construction year
The Blue Line is a 30 km line with 14 stations, from Creek station in Al Jaddaf across Dubai Creek to Academic City, with a branch from Centrepoint through Mirdif to International City. The Dubai Media Office reported 20% progress in May 2026, and the RTA targeted 30% by the end of 2026.
In 2027 that means tunnelling, the 1.3 km bridge over the Creek and station structures. If you are buying near the route, expect works nearby rather than trains. The stations serve Al Jaddaf, Dubai Creek Harbour, Ras Al Khor, International City, Al Warsan, Dubai Silicon Oasis and Academic City. Our Blue Line guide has the station-by-station detail.
Gold Line: a contract year
Dubai approved the Gold Line in April 2026. It is 42 km long with 18 stations, starting at Al Ghubaiba and running through Mina Rashid, City Walk, Business Bay, Mohammed Bin Rashid City, Nad Al Sheba, Mohammed bin Rashid Gardens, Meydan, Al Barsha South and Jumeirah Village Circle to Jumeirah Golf Estates.
The Dubai Media Office set tenders for 2026 and the contract award for 2027, with opening on 9 September 2032. Communities on the route with our area pages include City Walk, Business Bay, Mohammed Bin Rashid City, Nad Al Sheba, Hadaeq Sheikh Mohammed Bin Rashid, Jumeirah Village Circle and Jumeirah Golf Estates.
A home handing over in 2027 near a Gold Line station will have about five years without the line. Plan around the roads and the Red Line in the meantime.
07Can the Dubai Loop be dated yet?
No. The RTA signed its agreement with The Boring Company on 3 February 2026, and gave durations rather than dates. The 6.4 km pilot, with four stations between DIFC and Dubai Mall, takes about a year once design and preparations are finished; the full route of up to 22.2 km and 19 stations takes about three years.
In September 2026 the Dubai Media Office said tunnel boring machine assembly and segment casting were under way. Whether the pilot carries passengers in 2027 depends on when design and preparations were counted as complete, which has not been dated.
The Loop serves DIFC, Downtown Dubai, Business Bay and the Trade Centre district, all already on the Red Line. Our Dubai Loop guide explains the plan and how it changed between 2025 and 2026.
08Which roads and bridges are due by 2027?
The RTA's 2025-2027 plan is the main programme. In May 2025 the Dubai Media Office said it covers 57 projects with 226 km of roads and 115 bridges and tunnels, to be completed by 2027. The plan gives the programme a 2027 end date, not each corridor.
| Corridor | What it is | RTA's stated benefit | Serves |
|---|---|---|---|
| Umm Suqeim-Al Qudra | 16 km from Jumeirah Street to Emirates Road, 7 km of bridges | Travel time 46 to 11 minutes | Residential areas with more than a million people |
| Hessa Street | Four intersections, 9 km of bridges, cycle track | Travel time 30 to 7 minutes | About 640,000 residents |
| Al Fay Street | 12.9 km extension of Al Khail Road to Emirates Road | 64,400 more vehicles an hour | About 600,000 residents |
Figures are from the RTA and the Dubai Media Office in May 2025. Hessa Street's second phase is listed on the RTA's ongoing projects page as serving 10 areas, including Jumeirah Village Circle.
Projects that finish after 2027
Two large corridors announced in 2026 are due by the end of 2028, so they will be under construction for all of 2027:
- Al Meydan Street. Two contracts worth AED 1.161 billion, with 17 km of roads and 3,700 m of bridges. The RTA says it serves Dubai Hills Estate, Nad Al Sheba, Mohammed Bin Rashid Gardens, District One in Mohammed Bin Rashid City and Al Barari, and cuts the trip from Al Manama Street to Umm Suqeim Street from 30 to 10 minutes.
- Latifa bint Hamdan Street. About 12.2 km from Al Khail Road to Emirates Road, cutting the trip from Umm Al Sheif Street to Emirates Road from 33 to 15 minutes, by the RTA's estimate.
In April 2026 the RTA also awarded a contract to upgrade Umm Suqeim Street, Al Wasl Road, Al Safa Street and seven Jumeirah Street intersections. No completion date was given. It serves Jumeirah, Umm Suqeim, Al Manara, Al Sufouh, Al Barsha and Al Quoz.
What already opened in 2026
Some projects buyers still ask about are already finished. The 1,500 m Dubai Harbour bridge from Sheikh Zayed Road was scheduled to open in stages in June and July 2026, and the World Trade Centre roundabout's last bridge in October 2026. They are part of today's road network, not 2027's.
09Which malls, schools and hospitals are due in 2027?
Two malls, one school and two healthcare projects have 2027 dates from their operators or the Dubai Media Office. All are near established communities with off-plan projects on sale.
Malls
Skylight Mall on Al Khail Road is a super-regional mall by Dubai Retail, with 1.3 million sq ft of lettable space and more than 360 stores, due in 2027. It sits beside Jumeirah Village Triangle, Jumeirah Islands and The Springs.
The Yard is Palm Jebel Ali's first retail and lifestyle destination, also by Dubai Retail and due in 2027, with about 70,000 sq ft and 26 concepts. Mall of the Emirates adds an outdoor dining courtyard in early 2027 as part of Majid Al Futtaim's AED 5 billion transformation. Our new malls guide covers every announced mall.
These are the Jumeirah Village Triangle projects we track, the nearest to Skylight Mall:
| Project | Developer | Homes | From | Payment plan | Handover | Status |
|---|---|---|---|---|---|---|
| Ashwood Residences | Skyland Properties | Apartment · Penthouse | AED 895K | 25/45/30 | Q2 2028 | Selling |
| Fashionz by Danube | Danube Properties | Apartment · Branded residence | AED 960K | 10/10/10/70 | Jun 2027 | Selling |
| Tréppan Tower | Fakhruddin Properties | Apartment | On request | On request | On request | Selling |
| ELAR1S SKY | Object 1 | Apartment | On request | On request | 2028 | Selling |
| Interstellar Tower | Mr. Eight Development | Apartment · Commercial | AED 1.12M | 20/30/50 | Q3 2028 | Selling |
| Sky Gate Tower | Tiger Properties | Apartment · Duplex | AED 600K | On request | On request | Selling |
| Volga Tower | Tiger Properties | Apartment | AED 1.5M | On request | On request | Selling |
| SOL Levante | SOL Properties | Apartment · Commercial | On request | 10/10/7.5/7.5/7.5/7.5/50 | Q3 2028 | Selling |
| Native Haus | Native Properties | Apartment | AED 725K | On request | Q3 2029 | New launch |
| VOXA by Pantheon | Pantheon Development | Apartment | AED 640K | 20/40/5/35 | Q4 2028 | Selling |
| S1LVIANA Park Living | Object 1 | Apartment · Commercial | On request | On request | On request | Selling |
| ELAR1S RISE | Object 1 | Apartment · Commercial | On request | On request | 2028 | Selling |
| Binghatti Luxuria | Binghatti Developers | Apartment | AED 1.25M | 20/50/30 | Q3 2027 | Selling |
Schools
Horizon English School Town Square, a British-curriculum school by Cognita with Nshama, is due in August 2027, opening with FS1 to Year 8 for 2027-28. It serves Town Square.
KHDA said seven new private schools opened for 2026-27, so several communities gained schools in the year before. Our new schools guide lists them by community, with the ones announced for later years.
Hospitals and clinics
Mediclinic Parkview Hospital is getting an AED 420 million expansion with oncology, paediatric urgent care, musculoskeletal and sports medicine, and day surgery, due for completion in 2027. Mediclinic says it serves the residential communities of south Dubai.
IBN SINA+, a five-floor medical complex of about 5,800 sq m with surgical, diagnostic and outpatient space, is due in November 2027 in Dubai Healthcare City, alongside an office building, PIXEL DHCC.
10Which communities does each project serve?
The chart below brings the projects and the communities together. Where an official release names the districts served, we use its names; otherwise we name the nearest of our area pages.
Some communities appear more than once. Jumeirah Golf Estates has the Etihad Rail station now and a Gold Line terminus planned for 2032. Business Bay is on both the Gold Line and the Dubai Loop. Mohammed Bin Rashid City and Nad Al Sheba sit on the Gold Line and the Al Meydan Street works.
11What does 2027 mean for each project?
It helps to sort the list into three groups: projects that open in 2027, projects that keep building through 2027 and open later, and projects with no calendar date. Each group calls for a different question before you buy.
- Dated in 2027. Ask whether the date falls before or after your handover, and whether the project opens in stages.
- Building in 2027, opens later. Ask how close the works are to your building, and how long you will live with them.
- No calendar date yet. Treat it as a plan, and do not let it decide where you buy.
12How should a 2027 date shape an off-plan purchase?
Use infrastructure dates the way you use a handover date: as a target that can move. The useful question is not whether a project is coming, but whether it will be there when you need it.
Worked example: a townhouse near Town Square, handover late 2027
Say you are buying a townhouse with a stated handover in the fourth quarter of 2027, and your child starts Year 5 in September 2027. Horizon English School Town Square is due in August 2027 with FS1 to Year 8, so on paper the dates line up.
But handovers can slip, and a new school fills its places from its first applications. If you are relying on that school, ask it for its 2027-28 admissions timetable now, and have a second school in mind in case either date moves. Our new schools guide lists the schools already open nearby.
Worked example: an apartment near a Gold Line station, handover 2027
Say an apartment on the Gold Line route hands over in 2027. The line opens on 9 September 2032, about five years later, and its contract is only due to be awarded in 2027.
For those five years your transport is the existing roads, the Red Line and any feeder buses. There may also be construction near the station site. Judge the apartment on how it works for you today, and treat the Gold Line as a later addition.
Projects handing over in 2027
The table below lists the projects we track with a 2027 handover, earliest first. It updates as projects are added.
| Project | Area | Developer | From | Payment plan | Handover |
|---|---|---|---|---|---|
| Haya on the Park by Nshama | Town Square | Nshama | On request | 10/10/10/10/10/10/40 | Feb 2027 |
| Binghatti Aquarise | Business Bay | Binghatti Developers | AED 2M | 20/50/30 | Q1 2027 |
| Cotier House by Imtiaz | Dubai Islands | Imtiaz Developments | On request | On request | Q1 2027 |
| Cove by Imtiaz | Dubailand Residence Complex | Imtiaz Developments | On request | 60/40 | Q1 2027 |
| Delvara Residence, JVC | Jumeirah Village Circle | Cavara Development | On request | On request | Q1 2027 |
| Golf Greens at DAMAC Hills | Dubailand | DAMAC Properties | AED 1.87M | On request | Q1 2027 |
| Oceanz by Danube | Dubai Maritime City | Danube Properties | AED 1.2M | On request | Q1 2027 |
| Palm Beach Towers | Palm Jumeirah | Nakheel | On request | On request | Q1 2027 |
| Pristine by Zoya | Al Furjan | Zoya Developments | On request | On request | Q1 2027 |
| Samana Mykonos Signature | Arjan | Samana Developers | AED 998K | On request | Q1 2027 |
| Samana Waves | Jumeirah Village Circle | Samana Developers | AED 476K | On request | Q1 2027 |
| Elitz 3 by Danube | Jumeirah Village Circle | Danube Properties | AED 1.26M | On request | Apr 2027 |
| Sportz by Danube | Dubai Sports City | Danube Properties | AED 1.45M | On request | May 2027 |
| Al Waha Residences 2 | Dubai South | Expo City Dubai | AED 1.89M | 10/40/50 | Q2 2027 |
| Asayel Avenue | Mirdif | Dubai Investment Real Estate | On request | On request | Q2 2027 |
| Autograph Collection at DAMAC Hills | Dubailand | DAMAC Properties | On request | On request | Q2 2027 |
| Beach Walk 4 by Imtiaz | Dubai Islands | Imtiaz Developments | On request | 20/40/40 | Q2 2027 |
| Burj Binghatti Jacob & Co Residences | Business Bay | Binghatti Developers | AED 8.4M | 20/50/30 | Jun 2027 |
| Canal Heights de GRISOGONO by DAMAC | Business Bay | DAMAC Properties | AED 12.46M | On request | Q2 2027 |
| Celeste | Al Jaddaf | HRE Development | On request | 20/10/10/10/50 | Q2 2027 |
| Chic Tower by DAMAC | Business Bay | DAMAC Properties | AED 4.71M | On request | Q2 2027 |
| Courtyard One | Dubai South | Golden Light Real Estate Developments | AED 1.09M | 20/20/30/30 | Q2 2027 |
| Eleve by Deyaar | Downtown Jebel Ali | Deyaar | On request | 10/48/12/30 | Q2 2027 |
| Fashionz by Danube | Jumeirah Village Triangle (JVT) | Danube Properties | AED 960K | 10/10/10/70 | Jun 2027 |
| Franck Muller Aeternitas | Dubai Marina | London Gate | On request | 40/60 | Q2 2027 |
| Gharbi II Residences | Jumeirah Village Circle | Rabdan Developments | AED 1.62M | 20/40/10/30 | Q2 2027 |
| Harbour Lights by DAMAC | Dubai Maritime City | DAMAC Properties | AED 6.67M | 20/80 | Q2 2027 |
| Lagoon Views at DAMAC Lagoons | Dubailand | DAMAC Properties | AED 1.63M | 20/50/30 | Q2 2027 |
| Miorah by Zoya | Dubai South | Zoya Developments | On request | On request | Q2 2027 |
| Mira Villas designed by Bentley Home | Mohammed Bin Rashid City | Mira Developments | AED 27.21M | 50/50 | Q2 2027 |
Our handover in 2027 page lists the same projects in full, and near-handover projects shows the ones closest to completion.
13Checklist: using 2027 infrastructure in a buying decision
- Find the official source. Look for an RTA, Dubai Media Office, Etihad Rail, Dubai Airports or operator release with a date. A brochure line is not enough.
- Note the kind of date. A day, a month, a half-year or a year only.
- Line it up with your handover. If the project is due after you move in, plan for the months without it.
- Check the exact location. Station entrances, vertiports and school sites can be further from a building than a map suggests.
- Ask about staged openings. Malls and roads often open in parts; schools add year groups each year.
- Plan for construction. A line or road due in 2028 or later means works during 2027.
- Price on comparable sales. Judge the price against registered sales of similar homes, not against a future project.
- Keep a fallback. Have a second school, route or shopping option if a date moves.
14What do the official announcements cover, and what do they not?
The releases cover what is being built, by whom, and the target date. Several give expected passenger numbers, residents served or travel-time savings. Those are the authority's own estimates.
They do not tell you how far a station or school is from a particular building, what a project will do to prices or rents, or how many places a new school will have in each year group. No official body has published a price effect for any of these projects, and we do not make one.
The Dubai 2040 Urban Master Plan is the longer-term framework behind many of these projects. It sets where growth is planned, not the date of any one station or road.
15Key terms
- DWC. Dubai World Central, the code for Al Maktoum International Airport in Dubai South.
- Vertiport. A take-off and landing site for electric air taxis, with passenger facilities.
- eVTOL. Electric vertical take-off and landing aircraft, the type Joby flies.
- RAKTA. The Ras Al Khaimah Transport Authority.
- RTA. Dubai's Roads and Transport Authority, which runs the Metro, roads, buses and the air taxi and Loop projects.
- Contract award. The point at which the main construction contract is signed; for the Gold Line, 2027. Building starts after it.
- Phased opening. A project that opens in parts, such as a mall's first stores or a runway before a terminal.
16Where to go next
- Dubai Metro Blue Line: the route, stations and 2029 opening.
- Etihad Rail passenger service: stations, fares and journey times.
- Al Maktoum International expansion: the airport and the communities around it.
- The Dubai Loop: the tunnel plan with The Boring Company.
- New malls in Dubai and new schools in Dubai.
- Dubai off-plan launches announced for 2027.
- Browse all projects, new launches and developers.
ProjectsProjects mentioned in this guide.
FAQQuestions buyers ask.
What major infrastructure opens in Dubai in 2027?
The officially dated items are the second runway at Al Maktoum International by the end of 2027, Skylight Mall on Al Khail Road and The Yard on Palm Jebel Ali, Horizon English School Town Square in August 2027, the Mediclinic Parkview Hospital expansion and IBN SINA+ in Dubai Healthcare City in November 2027. The RTA's 2025-2027 road plan is also due to be finished in 2027 as a programme.
Will the Dubai Metro Blue Line open in 2027?
No. The Blue Line is due to open on 9 September 2029. It was 20% complete in May 2026, and the RTA targeted 30% by the end of 2026, so 2027 is a construction year. Tunnelling, the Dubai Creek bridge and the stations will be built during it.
When does the Dubai air taxi start?
The RTA and Joby's official target was a commercial passenger launch in 2026, with four vertiports at Dubai International Airport, near Dubai Mall, at Atlantis The Royal on Palm Jumeirah and in Dubai Marina. Check the RTA for the start date before relying on it. Separately, Ras Al Khaimah's transport authority targets 2027 for a Dubai to Ras Al Khaimah air taxi route.
When does Etihad Rail reach Sharjah city?
Etihad Rail's Sharjah station at University City is due to open on 30 March 2027. Until then the open Sharjah station is Al Dhaid, inland on the line to Fujairah. Muwaileh and Aljada are the nearest of our Sharjah area pages to University City.
Is Al Maktoum International Airport opening in 2027?
Not as Dubai's main airport. Dubai Airports says the next major milestone is DWC's second runway by the end of 2027, and that flydubai could move five or six aircraft there as early as 2027. The new passenger terminal begins operations in 2032, and the move from DXB is phased as capacity becomes available.
Which Dubai roads are being finished in 2027?
The RTA's 2025-2027 plan covers 57 projects with 226 km of roads and 115 bridges and tunnels, including the Umm Suqeim-Al Qudra corridor, Hessa Street and Al Fay Street. The RTA does not give each corridor its own date in that plan. Al Meydan Street and Latifa bint Hamdan Street are due by the end of 2028.
Does new infrastructure raise property prices?
No official body has published a figure for what any of these projects will do to prices or rents, and we do not make one. Treat a station, road or mall as a convenience with a date attached, check that the date fits your plans, and judge the price on comparable sales.
Sources & methodWhere these figures come from.
Sources
- mediaoffice.ae: Rta and joby complete first crewed evtol taxi flight
- mediaoffice.ae: Dubais first aerial taxi vertiport
- rakta.gov.ae
- corporate.etihadrail.ae: Etihad rail celebrates first month since official launch of passenger network
- corporate.etihadrail.ae: Hamdan bin zayed receives etihad rail delegation and directs the launch of madinat zayed and liwa passenger stations on 30 november
- corporate.etihadrail.ae: Etihad rail opens direct pedestrian bridge linking dubai al yalayis station with jumeirah golf estates metro station
- etihadrail.ae: Dubai
- mediaoffice.ae: Dubai airports ceo outlines dxb growth and future of dubai aviation
- mediaoffice.ae: Hamdan bin mohammed approves al maktoum airport
- mediaoffice.ae: Al maktoum international airport
- rta.ae: Dubai metro blue line
- mediaoffice.ae: Rta
- mediaoffice.ae: Mohammed bin rashid inaugurates tunneling works for the dubai metro blue line tunnels
- mediaoffice.ae: Mohammed bin rashid approves dubai metro gold line
- mediaoffice.ae: Rta signs agreement with the boring company to commence implementation of dubai loop
- mediaoffice.ae: Hamdan bin mohammed meets the boring company delegation
- mediaoffice.ae: Hamdan bin mohammed reviews progress of key strategic road corridors
- rta.ae: 2024 2027 plan 22 projects
- rta.ae: Ongoing projects
- mediaoffice.ae: Rta
- prod.mediaoffice.ae: Rta maydan street
- prod.mediaoffice.ae: Rta awards contract for umm suqeim and al wasl and al safa streets development project
- dubaiholding.com: Dubai retail announces skylight mall a new super regional mall opening in 2027
- mediaoffice.ae: Dubai retail unveils the yard
- majidalfuttaim.com: Pr_majid al futtaim announces aed 5 billion investment to transform moe_en.pdf
- cognita.com: Horizon english school expands its outstanding offering with new all through campus in town square
- web.khda.gov.ae: Dubai’s private education sector expands with new
- mediaoffice.ae: Mediclinic middle east announces aed 420 million investment
- mediaoffice.ae: Dubai healthcare city breaks ground on two flagship projects
- mediaoffice.ae: Mohammed bin rashid
What we could not verify
- The Dubai air taxi network's official target was a commercial launch in 2026; we found no official statement of a start date or a replacement date when we checked on 23 November 2026, so the text gives no 2027 date for it.
- Dates are each authority's or operator's stated target as of 23 November 2026. A year without a day can mean any point in that year, and large works often open in stages.