The Dubai Loop: route, stations and the communities it will serve (2026)

The Dubai Loop is the RTA's underground passenger tunnel with The Boring Company. Here is the official route, the pilot between DIFC and Dubai Mall, the full 22.2 km plan, the timeline, and what it means for homes in DIFC, Downtown Dubai, Business Bay and Trade Centre.

OffPlan Insider ResearchWritten and reviewed by the research desk
Published 4 Nov 202610 min read11 sources cited
The short answer

The Dubai Loop is an underground passenger tunnel network that Dubai's Roads and Transport Authority (RTA) is building with the US firm The Boring Company, using electric vehicles in 3.6 m tunnels. Under the agreement signed on 3 February 2026, the first phase is a 6.4 km pilot with four stations linking the Dubai International Financial Centre (DIFC) and Dubai Mall, costing about AED 565 million. The full route runs up to 22.2 km with 19 stations, connecting Dubai World Trade Centre and the financial district with Business Bay, for about AED 2 billion. The RTA gives durations rather than dates: about one year for the pilot once design and preparations are complete, and about three years for the full route.

Key takeaways

  1. The Dubai Loop is an RTA project with The Boring Company: tunnels of 3.6 m diameter carrying passengers in vehicles, designed for first- and last-mile trips and links between key destinations.
  2. The pilot is 6.4 km with four stations between DIFC and Dubai Mall, at about AED 565 million, and is expected to carry about 13,000 passengers a day.
  3. The full route is up to 22.2 km with 19 stations, linking Dubai World Trade Centre and the financial district with Business Bay, at about AED 2 billion and about 30,000 passengers a day.
  4. The plan changed between 2025 and 2026. The February 2025 memorandum studied a 17 km tunnel with 11 stations; the February 2026 agreement replaced those figures.
  5. The RTA gives durations, not opening dates: about one year for the pilot after design and preparations, about three years for the full route. In September 2026 boring machine assembly and segment casting were under way.
  6. The districts on the route, DIFC, Downtown Dubai, Business Bay and Trade Centre, are already served by the Metro Red Line. The Loop adds short links between them; it does not replace the metro.
  7. Buy for the building, the price and the existing transport. Exact sites for most Loop stations are still to be confirmed, so do not pay extra for a promised station next door.

01What is the Dubai Loop?

The Dubai Loop is an underground passenger transport network that Dubai's Roads and Transport Authority (RTA) is building with The Boring Company, a US tunnelling firm. Passengers travel in electric vehicles through tunnels 3.6 m in diameter.

The RTA describes it as designed for flexible urban mobility: first- and last-mile trips and quick connections between key destinations. It is meant to sit alongside the Dubai Metro, not to replace it.

The RTA and The Boring Company signed an agreement to begin implementation on 3 February 2026, at the World Governments Summit. A year earlier, on 13 February 2025, they had signed a memorandum to study the idea.

This guide sets out the official route, numbers and timeline, and what the Loop does and does not change if you are buying a home in the districts it serves.

02What is the Dubai Loop route?

The pilot links DIFC and Dubai Mall over 6.4 km with four stations. The full route runs up to 22.2 km with 19 stations, connecting Dubai World Trade Centre and the financial district with Business Bay.

Schematic, not to scale, of the districts the Dubai Loop is planned to link, drawn beside Sheikh Zayed Road and the existing Metro Red Line. From north-east to south-west: Dubai World Trade Centre, on the full route; DIFC, one end of the pilot route; Dubai Mall in Downtown, the other end of the pilot route; and Business Bay, on the full route. The pilot is 6.4 km with 4 stations, shown as a solid line between DIFC and Dubai Mall; the full route is up to 22.2 km with 19 stations, shown dashed.
The districts on the Dubai Loop's pilot and full routes. Schematic, not to scale.
The Dubai Loop pilot and full route, as announced by the RTA on 3 February 2026.
Pilot (phase one)Full route
Length6.4 kmUp to 22.2 km
Stations419
DistrictsDIFC and Dubai MallDubai World Trade Centre and the financial district to Business Bay
Approximate costAED 565 millionAED 2 billion
Expected passengersAbout 13,000 a dayAbout 30,000 a day
Time to deliverAbout one year after design works and preparationsAbout three years

The tunnels. The RTA gives a diameter of 3.6 m, dedicated to vehicles. That is far narrower than a metro tunnel, which is why the system carries passengers in cars rather than trains.

Station sites. The official announcements name the districts the route connects rather than a full list of station sites. Before you rely on a station being close to a particular building, ask the RTA or check its published route plans.

03How has the Dubai Loop plan changed since 2025?

It has become shorter at first and longer overall. The 2025 memorandum studied a 17 km tunnel with 11 stations; the 2026 agreement starts with a 6.4 km pilot and plans a full route of up to 22.2 km with 19 stations.

Comparison of the Dubai Loop in February 2025 and February 2026. February 2025, study stage, a memorandum to study the idea: 17 km of tunnel proposed, 11 stations proposed, a stated capacity of more than 20,000 passengers per hour, with no cost or date set. February 2026, an agreement to start implementation: a 6.4 km pilot route with four stations, an approximate pilot cost of AED 565 million, a full route of 22.2 km with 19 stations and an approximate full-route cost of AED 2 billion. Also in the 2026 agreement: 3.6 m tunnels for vehicles, a pilot carrying about 13,000 passengers a day and a full route about 30,000, with the pilot about one year after design and preparation and the full route about three years.
The 2025 study figures against the 2026 agreement. Plan on the 2026 numbers.

February 2025: the study. The memorandum signed at the World Governments Summit 2025 was an agreement to study the project. The Dubai Media Office described a 17 km tunnel with 11 stations and a capacity of more than 20,000 passengers an hour, as part of a long-term plan for an underground network across the city. The RTA supplied geotechnical, utility, structural, environmental and transport-standards data for the study.

February 2026: the agreement to build. The agreement signed a year later set the pilot and full-route figures in the table above, with costs and delivery periods. The next day, the Dubai Media Office reported a review of the Dubai Loop and the Glydways autonomous transit project.

If you read older articles quoting 17 km and 11 stations, they describe the study, not the plan now being built.

04When will the Dubai Loop open?

There is no official calendar date. The RTA says the pilot will be delivered about one year after design works and preparations are complete, and the full route in about three years.

Timeline of the Dubai Loop. 13 February 2025: memorandum, the RTA and The Boring Company agree to study a Dubai Loop. 3 February 2026: implementation agreement for a pilot of 6.4 km and four stations and a full route of up to 22.2 km with 19 stations. 4 February 2026: the Ruler of Dubai reviews the Dubai Loop and Glydways projects. 29 September 2026: progress update, with boring machine assembly and casting of tunnel-lining segments under way. Then two durations rather than dates: the pilot about one year from completion of design works and preparations, and the full route about three years. A note says there is no opening date yet and that any opening year seen elsewhere should be treated with care.
Dated official milestones, followed by the RTA's stated durations.

On 29 September 2026 the Dubai Media Office reported a progress review with The Boring Company. Preliminary works were continuing in parallel workstreams, the tunnel boring machine was being assembled and concrete tunnel-lining segments were being cast.

What that means in practice. Boring machine assembly and segment casting come before tunnelling. The pilot clock of about one year runs from the end of design and preparation, so a firm opening date is on request from the RTA.

05What is confirmed, and what is still to be decided?

The route's districts, length, station count, costs, expected passengers and delivery periods are confirmed in the February 2026 agreement. Station addresses, fares, vehicles and a calendar opening date are on request from the RTA.

What the official Dubai Loop announcements confirm, and what a buyer should treat as open.
QuestionConfirmed by the RTAStill to be confirmed
RoutePilot between DIFC and Dubai Mall; full route from Trade Centre and the financial district to Business BayThe exact alignment street by street
Stations4 on the pilot, 19 on the full routeNames and sites of individual stations
Length6.4 km pilot; up to 22.2 km full routeFinal length once the full alignment is fixed
CostAbout AED 565 million pilot; about AED 2 billion full routeNone for buyers; fares are separate
PassengersAbout 13,000 a day pilot; about 30,000 a day full routeJourney times between stations
TimingAbout one year for the pilot after design and preparations; about three years for the full routeA calendar opening date
VehiclesElectric vehicles in 3.6 m tunnelsVehicle type, number and speed
FaresNone statedFares and how they link with Nol cards

The column on the right is where marketing claims tend to appear. If an advert gives a station name next to a building, a journey time or an opening year, ask for the RTA document it comes from.

06How many passengers will the Dubai Loop carry?

The RTA expects the pilot to carry about 13,000 passengers a day and the full route about 30,000 a day.

For scale, the Dubai Media Office said in May 2026 that the metro and tram network carried about 295 million trips in 2025, an average of about one million a day. The Loop is a short-trip link in the city centre, not a mass-transit line on that scale.

07Which communities will the Dubai Loop serve?

The route serves Dubai's central business and residential districts along Sheikh Zayed Road: DIFC, Downtown Dubai around Dubai Mall, Business Bay and the Trade Centre area. Each is already on the Metro Red Line.

The districts on the Dubai Loop route and the metro stations that already serve them.
DistrictOn the LoopExisting Metro Red Line stationOur area page
DIFCPilot, and full routeFinancial CentreDIFC
Downtown Dubai (Dubai Mall)Pilot, and full routeBurj Khalifa/Dubai MallDowntown Dubai
Business BayFull routeBusiness BayBusiness Bay
Dubai World Trade CentreFull routeWorld Trade CentreZabeel, next door

DIFC

DIFC, the Dubai International Financial Centre, is the financial district on Sheikh Zayed Road between Trade Centre, Zabeel and Downtown Dubai. It mixes offices with homes, galleries and restaurants, and is one end of the Loop's pilot route. Our DIFC area page covers the district in full.

2 off-plan projects in DIFC on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Akala ResidencesAradaApartment · Penthouse · Branded residenceAED 3.79M10/50/40Q4 2029Selling
Four Seasons Private Residences Dubai at DIFCH&HBranded residence · Apartment · PenthouseOn requestOn request2029Under construction

Downtown Dubai

Downtown Dubai is Emaar's district around the Burj Khalifa and Dubai Mall, and the other end of the pilot route. It is served today by Burj Khalifa/Dubai Mall station on the Red Line. See our Downtown Dubai area page for every project and price.

8 off-plan projects in Downtown Dubai on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
DWTN ResidencesDeyaarApartment · Duplex · PenthouseOn requestOn requestOn requestSelling
Binghatti SkybladeBinghatti DevelopersApartmentAED 1.76M20/50/30Q4 2027Selling
Fairmont Residences Solara TowerSOL PropertiesApartment · Penthouse · Branded residenceOn request20/40/40Q3 2027Under construction
Inaura DowntownAradaApartment · Duplex · Penthouse · Branded residenceAED 3.59M10/40/50On requestSelling
Mercedes-Benz Places | BinghattiBinghatti DevelopersApartment · Penthouse · Branded residenceAED 11.5M20/50/30Dec 2026Near handover
Rove Home Downtown DubaiIRTH GroupApartment · Branded residenceOn requestOn request2026Near handover
Sofitel Residences Dubai City ViewCITYVIEW DevelopmentsBranded residence · Apartment · Duplex · PenthouseAED 2.61M20/30/50Q4 2029Selling
Trump International Hotel & Tower DubaiDarGlobalApartment · Penthouse · Branded residenceOn requestOn requestDec 2031Selling

Business Bay

Business Bay is the mixed-use district beside Downtown Dubai along the Dubai Water Canal, and the southern end of the Loop's full route. It is also on the planned Gold Line: in April 2026 the Dubai Media Office announced a 42 km, 18-station underground line from Al Ghubaiba to Jumeirah Golf Estates, with an interchange to the Red Line at Business Bay, due to open on 9 September 2032. See our Business Bay area page.

21 off-plan projects in Business Bay on OffPlan Insider, November 2026, newest 20 shown. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Bayz 101 by DanubeDanube PropertiesApartmentAED 1.32MOn requestJun 2029Selling
Bayz 102 by DanubeDanube PropertiesApartment · PenthouseAED 2.59MOn requestDec 2029Selling
One River PointEllington PropertiesApartment · Duplex · PenthouseOn requestOn requestOn requestUnder construction
Burj Binghatti Jacob & Co ResidencesBinghatti DevelopersApartment · Penthouse · Branded residenceAED 8.4M20/50/30Jun 2027Selling
Bugatti Residences by BinghattiBinghatti DevelopersApartment · Penthouse · Branded residenceAED 19.4M20/50/30Aug 2027Selling
Binghatti SkyhallBinghatti DevelopersApartmentAED 1.3M20/50/30On requestNear handover
Binghatti AquariseBinghatti DevelopersApartmentAED 2M20/50/30Q1 2027Selling
Binghatti SkyriseBinghatti DevelopersApartmentAED 2.54M20/50/30Q4 2026Near handover
VELA, Dorchester Collection, DubaiOMNIYATApartment · Duplex · Penthouse · Branded residenceOn requestOn requestQ4 2027Selling
Chic Tower by DAMACDAMAC PropertiesApartment · Branded residenceAED 4.71MOn requestQ2 2027Selling
Safa Two de GRISOGONODAMAC PropertiesApartment · Penthouse · Branded residenceAED 3.26MOn requestQ2 2027Selling
Al Habtoor TowerAl Habtoor GroupApartmentOn request10/15/35/402026Selling
Tiger Sky TowerTiger PropertiesApartment · PenthouseAED 2.5MOn requestOn requestSelling
Altitude de GRISOGONO by DAMACDAMAC PropertiesApartment · Branded residenceAED 2.75MOn requestQ1 2028Selling
Avarra by PalaceEmaar PropertiesApartment · Penthouse · Branded residenceAED 2.71M10/80/10Jun 2031Selling
Canal Crown by DAMACDAMAC PropertiesApartment · Branded residenceAED 3.5M60/40Q4 2027Selling
Canal Heights de GRISOGONO by DAMACDAMAC PropertiesApartment · Branded residenceAED 12.46MOn requestQ2 2027Selling
Couture by CavalliDAMAC PropertiesApartment · Penthouse · Branded residenceAED 21.9M60/40Q4 2028Selling
DG1 by DarGlobalDarGlobalApartmentOn requestOn requestDec 2027Selling
Rove Home Marasi DriveIRTH GroupApartment · Branded residenceOn requestOn request2027Selling

Trade Centre and Zabeel

The full route's northern end is Dubai World Trade Centre, the convention and exhibition district. Zabeel, the district next to it between DIFC and Zabeel Park, is where Emaar is building Address Residences Zabeel. See our Zabeel area page.

1 off-plan project in Zabeel on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Address Residences ZabeelEmaar PropertiesApartment · Penthouse · Branded residenceAED 2.96MOn requestOn requestSelling

For the whole city, see all off-plan projects or the latest launches.

08How does the Dubai Loop fit with the Dubai Metro?

It adds short links between places the metro already reaches. The Red Line runs along Sheikh Zayed Road through the same districts; the Loop is designed for first- and last-mile trips and connections between destinations.

Three rail projects shape transport in and near these districts over the next few years.

Transport projects relevant to central Dubai, with the dates officially announced.
ProjectWhat it isStatus and date
Dubai LoopUnderground vehicle tunnels, 6.4 km pilot and up to 22.2 km full routeImplementation agreement February 2026; about one year for the pilot after design and preparation
Metro Blue Line30 km, 14 stations in eastern Dubai, joining the Green and Red LinesUnder construction; opening 9 September 2029
Metro Gold Line42 km, 18 stations, fully underground, Al Ghubaiba to Jumeirah Golf Estates via Business BayApproved April 2026; opening 9 September 2032

Our Dubai Metro Blue Line guide covers the eastern line in detail.

09What does the Dubai Loop mean if I am buying a home?

Treat it as a possible convenience, not a reason to buy or a reason to pay more. Base your decision on the building, the price, the developer and the transport that exists today.

The districts are already connected. DIFC, Downtown Dubai, Business Bay and Trade Centre have Red Line stations now. A Loop station would shorten some trips within the centre, but the area's connectivity does not depend on it.

Station sites are not fixed in public. Beyond the pilot's two ends, the official releases give districts rather than addresses. Do not accept "a Loop station at the door" without seeing the RTA's plan.

Timing is open. The RTA gives durations, not dates. If transport timing matters to you, compare your building's completion date with the RTA's stated periods and plan on the existing metro.

Construction nearby. Tunnelling and station works can mean road diversions for a period. Ask the developer or the RTA what works are planned near the building you are considering.

10Checklist: judging a property advert that mentions the Dubai Loop

  1. Ask for the source. Any station site, opening date or journey time should come from the RTA or the Dubai Media Office.
  2. Check the figures are current. Adverts quoting 17 km and 11 stations are using the 2025 study figures.
  3. Measure to the existing metro. Note the walking distance to the nearest Red Line station today.
  4. Read your completion date. Your sale and purchase agreement sets your handover date; transport projects do not change it.
  5. Verify the project. Check the project and its escrow account on the Dubai Land Department register before paying. Our guide on how to check an off-plan project and developer shows how.
  6. Price on comparables. Compare price per square foot with similar homes nearby using Dubai Land Department registered sales, not with a future transport link.
  7. Budget the full cost. Fees, the handover payment and service charges are in our guide to the true cost of buying off-plan.

11Which district suits which buyer?

The four districts on the route are close together but different in character. The Loop does not change that; it shortens some trips between them.

The districts on the Dubai Loop route compared. Projects and prices are in the live tables above.
DistrictCharacterTypical off-plan homesWorth knowing
DIFCFinancial district with its own common-law courts, galleries and restaurantsA small number of high-end apartments and branded residencesFew launches; most homes are resale
Downtown DubaiEmaar's district around the Burj Khalifa, Dubai Mall and Dubai OperaApartments, many in branded and hotel-serviced towersPilot station area; busy with visitors
Business BayMixed-use towers on the Dubai Water Canal, next to DowntownThe widest choice, from studios to branded penthousesAlso on the planned Gold Line
Trade Centre and ZabeelConvention district beside Zabeel ParkA few large branded schemesNorthern end of the full route

If you are comparing apartments across these districts, our apartments page and branded residences page list current projects across Dubai.

12How do I follow the Dubai Loop's progress?

Use the RTA's news pages and the Dubai Media Office, which publish the government's announcements on the project. Dated, official statements are the ones to rely on.

For a home you have bought or are about to buy, follow the building rather than the transport. The Dubai Land Department's Project Status service in the Dubai REST app shows a registered project's certified completion percentage.

13Key terms

Terms used in this guide.
TermWhat it means here
LoopA tunnel network carrying passengers in road vehicles rather than trains
Pilot routeThe first, 6.4 km phase between DIFC and Dubai Mall
Full alignmentThe complete planned route, up to 22.2 km with 19 stations
First and last mileThe short trip between a home or office and a main transport line
Tunnel boring machineThe machine that excavates the tunnel and places the lining as it advances
Lining segmentsPrecast concrete pieces that form the tunnel wall
Memorandum of understandingAn agreement to study or co-operate, which comes before a contract to build

14Where to go next

If you are choosing between central districts, start with the DIFC, Downtown Dubai and Business Bay area pages, and our overview of Dubai's areas and districts. For the buying steps from reservation to keys, read our guide to buying off-plan property in Dubai.

ProjectsProjects mentioned in this guide.

FAQQuestions buyers ask.

What is the Dubai Loop?

The Dubai Loop is an underground passenger transport system that the RTA is building with The Boring Company. Passengers travel in electric vehicles through tunnels 3.6 m in diameter. The first phase is a 6.4 km pilot with four stations between DIFC and Dubai Mall; the full route is planned at up to 22.2 km with 19 stations.

Where will the Dubai Loop stations be?

The four pilot stations lie on the route between DIFC and Dubai Mall. The full route's 19 stations will connect Dubai World Trade Centre and the financial district with Business Bay. The RTA's announcements give the districts rather than a full list of station sites, so check with the RTA before relying on a station's exact position.

When will the Dubai Loop open?

The RTA gives durations rather than calendar dates. The pilot is due about one year after design works and preparations are complete, and the full route is expected to take about three years to implement. In September 2026 the Dubai Media Office said boring machine assembly and the casting of tunnel-lining segments were under way.

How much does the Dubai Loop cost to build?

The RTA puts the 6.4 km pilot at about AED 565 million and the full route of up to 22.2 km at about AED 2 billion. These are construction costs announced with the February 2026 agreement. Passenger fares are on request from the RTA.

Is the Dubai Loop the same as the Dubai Metro?

No. The Dubai Metro is a rail network of large trains on fixed lines. The Dubai Loop uses smaller electric vehicles in narrow tunnels for shorter trips within the city centre. The districts on the Loop's route are already served by Red Line stations, and the Loop is described as adding first- and last-mile links.

Who is building the Dubai Loop?

The Roads and Transport Authority (RTA) is delivering it with The Boring Company of the United States. The two signed a memorandum to study the project at the World Governments Summit on 13 February 2025, and an agreement to begin implementation at the same summit on 3 February 2026.

Is Downtown Dubai freehold?

Yes. Downtown Dubai, Business Bay and DIFC are areas where foreign buyers can own property outright, and off-plan purchases there are registered with the Dubai Land Department. Check that a project and its escrow account appear on the department's register before you pay.

Is the Dubai Loop the 93 km cycling 'Loop'?

No. The name has also been used for a separate concept for a covered walking and cycling route across Dubai. This guide covers the RTA's underground passenger tunnel with The Boring Company, which is the project with a signed implementation agreement.

Sources & methodWhere these figures come from.

Sources

  1. mediaoffice.ae: Rta signs agreement with the boring company to commence implementation of dubai loop
  2. rta.ae: Signing agreemennt with boring company to commence implementation of dubai loop
  3. mediaoffice.ae: Mohammed bin rashid reviews the dubai loop and glideways projects
  4. mediaoffice.ae: Hamdan bin mohammed meets the boring company delegation
  5. mediaoffice.ae: Hamdan bin mohammed attends mou signing between rta and the boring company for the dubai loop
  6. rta.ae: Hamdan bin mohammed attends mou signing between rta and the boring company for the dubai loop
  7. rta.ae: Al_Masar_201_Eng.pdf
  8. mediaoffice.ae: Mohammed bin rashid approves dubai metro gold line
  9. rta.ae: About metro
  10. Dubai Legislation Portal: Law No. (7) of 2006
  11. Dubai Legislation Portal: Law No. (8) of 2007

What we could not verify

  • The names and exact sites of the four pilot stations are not given in the RTA and Dubai Media Office releases we opened; press reports name them, but they are not used in the text.
  • No calendar opening date for the pilot or the full route appears in an official statement; the RTA gives durations of about one year after design and preparations for the pilot and about three years for the full route.
  • Fares, vehicle numbers, vehicle type and operating speed were not stated in the official releases and are not given.

4 Nov 2026 · Reviewed by OffPlan Insider Research. First published 4 Nov 2026.

Want options that fit your budget?

Tell us your budget and what the property is for. We check live prices, plans and availability with the developers and send the options that fit.

  1. Share your budgetAnd what the property is for
  2. We check with developersPrices, plans and availability
  3. You reserve directBooking and SPA are with the developer

No consultation fee · You book directly with the developer