The short answer

Dubai's announced new malls include Skylight Mall on Al Khail Road (1.3 million sq ft, more than 360 stores, due in 2027), The Yard on Palm Jebel Ali (2027), Dubai Square at Dubai Creek Harbour (completion expected about three years from December 2025), South Bay Mall in Dubai South, Sobha Mall in Sobha Hartland, Ghaf Woods Mall on the E311 and a large Majid Al Futtaim mall in a new Dubai South community. The Dubai Mall and Mall of the Emirates are also expanding, and The Grand in Nad Al Sheba Gardens began opening in phases in August 2026.

Key takeaways

  1. Ten mall projects in Dubai have been announced by their owners: four new community centres, three large new malls, two expansions of existing malls and one new Majid Al Futtaim mall still unnamed.
  2. The biggest new mall with a date is Skylight Mall on Al Khail Road: 1.3 million sq ft of lettable space and more than 360 stores, opening in 2027 beside Jumeirah Village Triangle and The Springs.
  3. Dubai Square at Dubai Creek Harbour covers 2.6 million sq m of retail, hospitality and commercial space, with completion expected about three years from December 2025.
  4. Most of the new openings are community malls inside master communities: The Grand in Nad Al Sheba Gardens, Sobha Mall in Sobha Hartland, South Bay Mall in Dubai South and The Yard on Palm Jebel Ali.
  5. Opening dates move. Treat a year as a target, and ask whether the mall has a main contractor and is under construction before you count on it.
  6. If a new mall is part of why you are choosing a home, check the walking or driving distance from your building and whether the mall opens before or after your handover.

A new mall changes daily life in a community more than almost anything else that gets built there. It brings the supermarket, the pharmacy, the clinic and the cinema within a short drive or a walk. For anyone buying off-plan, it also answers a practical question: where will I do my weekly shop when I move in?

This guide lists every new mall and mall expansion in Dubai that has been announced by its owner, with the location, the size, the opening timing and the communities each one serves. Projects reported only by brokers or in the press without an owner's announcement are left out until they are confirmed.

Jump to: the full list, opening dates, the large malls, community malls, expansions, what it means for buyers.

01Which new malls are coming to Dubai?

Ten mall projects in Dubai have been announced by their owners as of 4 November 2026. Three are large new malls, four are community centres, two are expansions of existing malls and one is a new Majid Al Futtaim mall that has not yet been named.

Mall Where Owner or developer Size as stated Opening
Skylight Mall Al Khail Road, beside Jumeirah Village Triangle Dubai Retail (Dubai Holding Asset Management) 1.3 million sq ft GLA, more than 360 stores 2027
Dubai Square Dubai Creek Harbour Emaar 2.6 million sq m of retail, hospitality and commercial area About three years from December 2025
Ghaf Woods Mall E311, inside Ghaf Woods Majid Al Futtaim To be confirmed To be confirmed
Majid Al Futtaim mall, Dubai South Near Al Maktoum International Majid Al Futtaim with Dubai South Anchor of a 22 million sq ft community To be confirmed
The Yard Palm Jebel Ali Dubai Retail About 70,000 sq ft GLA, 26 concepts 2027
South Bay Mall Dubai South Residential District Dubai South Properties About 200,000 sq ft, 60 units To be confirmed
Sobha Mall Sobha Hartland, Mohammed Bin Rashid City Sobha Realty 339,000 sq ft built-up, about 115,000 sq ft GLA Second half of 2026
The Grand Nad Al Sheba Gardens Shamal Holding Fully leased community centre In phases from 19 August 2026
Dubai Mall expansion Downtown Dubai Emaar 240 new retail and dining options To be confirmed
Mall of the Emirates transformation Al Barsha Majid Al Futtaim 20,000 sq m more retail, 100 new stores In phases to early 2027 and beyond

GLA means gross leasable area: the floor space let to shops and restaurants. It is smaller than the built-up area, which also counts corridors, parking and services.

Schematic map of Dubai, not to scale, with the Arabian Gulf to the north-west, showing where the announced malls are planned: Dubai Square at Dubai Creek Harbour, about 2028; the Dubai Mall expansion in Downtown, date to be confirmed; Sobha Mall in Sobha Hartland, second half of 2026; The Grand in Nad Al Sheba, opening in phases; Mall of the Emirates in Al Barsha, phases to 2027; Skylight Mall on Al Khail Road by JVT, 2027; Ghaf Woods Mall on the E311, date to be confirmed; The Yard on Palm Jebel Ali, 2027; South Bay Mall in Dubai South, date to be confirmed; and the Majid Al Futtaim mall near Al Maktoum International, date to be confirmed.
Where the announced malls are. Filled dots have an opening date or period; open dots are to be confirmed. Schematic, not to scale.

The pattern is clear on the map. The new malls follow the new housing: south-west towards Al Maktoum International, inland along Al Khail Road and the E311, and onto the new islands.

02When do the new malls open?

Two opened or were due to open in 2026, two have a 2027 date and one is expected about the end of 2028. Mall of the Emirates is opening in stages, and four dates are to be confirmed. The dates below are the owners' own.

Timeline of Dubai's announced mall openings at 4 November 2026: The Grand in Nad Al Sheba Gardens opening in phases from 19 August 2026, anchored by Waitrose, with health tenants in early 2027; Sobha Mall in Sobha Hartland, AED 210 million with 35 shops and food and beverage outlets, completion scheduled for the second half of 2026; four new entertainment concepts at Mall of the Emirates by late 2026, part of an AED 5 billion transformation with 100 new stores; the Mall of the Emirates outdoor food and beverage courtyard in early 2027; The Yard on Palm Jebel Ali in 2027, about 70,000 sq ft and 26 concepts for about 20,000 residents; Skylight Mall on Al Khail Road in 2027, 1.3 million sq ft and more than 360 stores; Dubai Square at Dubai Creek Harbour, completion expected three years from December 2025; and, with dates to be confirmed, the AED 1.5 billion Dubai Mall expansion with 240 new options, South Bay Mall in Dubai South with about 200,000 sq ft and 60 units, and Majid Al Futtaim's Ghaf Woods Mall and Dubai South mall.
Announced opening dates, as stated by each owner at 4 November 2026.

Three points to keep in mind when you read a date:

  • A year is a target, not a promise. Large malls often open in stages, with an anchor first and the rest of the units over the following months. The Grand, for example, opened its first phase in August 2026 and lists health tenants for early 2027.
  • A contractor is a firmer signal than a render. The Yard names its main contractor and the Dubai Mall expansion had its contractor mobilising when it was announced. Where no contractor is named, ask the developer what stage the project has reached.
  • "Completed in three years" is a window. Emaar's December 2025 statement on Dubai Square points to about the end of 2028. Count from the announcement date, not from today.

03What are the biggest new malls in Dubai?

The three large new malls are Skylight Mall, Dubai Square and Ghaf Woods Mall, with a fourth, unnamed Majid Al Futtaim mall planned in Dubai South. Each is built to draw shoppers from across the city, not only from the communities around it.

Comparison cards of Dubai's announced malls and expansions: Skylight Mall by Dubai Retail, 2027, on Al Khail Road beside JVT, Jumeirah Islands and The Springs, 1.3 million sq ft GLA and more than 360 stores; Dubai Square by Emaar, about 2028, at Dubai Creek Harbour, 2.6 million sq m of retail, hospitality and commercial area; Mall of the Emirates by Majid Al Futtaim, an ongoing AED 5 billion transformation adding 20,000 sq m of retail and 100 new stores; the Dubai Mall expansion by Emaar, date to be confirmed, AED 1.5 billion and 240 new luxury retail and dining options; South Bay Mall by Dubai South Properties in the Dubai South Residential District, about 200,000 sq ft, 60 units and two anchors; Sobha Mall by Sobha Realty, second half of 2026, in Sobha Hartland, 339,000 sq ft built-up and about 115,000 sq ft GLA; The Yard by Dubai Retail, 2027, on Palm Jebel Ali, about 70,000 sq ft GLA and 26 concepts; and Ghaf Woods Mall by Majid Al Futtaim, date to be confirmed, on the E311 inside the AED 15.4 billion Ghaf Woods, its 30th mall and 19th in the UAE. A note explains that GLA is lettable shop space while built-up and total areas include parking, hotels or offices.
The figures each owner has published. The units differ, so compare store counts rather than total areas.

Skylight Mall, Al Khail Road

Skylight Mall is a super-regional mall by Dubai Retail, the malls business of Dubai Holding Asset Management, announced on 6 October 2026 and scheduled to open in 2027. It will have 1.3 million sq ft of gross leasable area and more than 360 stores, with dining, entertainment and everyday services.

It sits on Al Khail Road beside Jumeirah Village Triangle, Jumeirah Islands and The Springs, with Jumeirah Village Circle just across the road. Those are some of Dubai's busiest areas for new apartments, and until now their nearest large malls have been a drive away. Our news story on Skylight Mall has the full announcement.

Dubai Square, Dubai Creek Harbour

Dubai Square is Emaar's retail and entertainment centre at Dubai Creek Harbour. Emaar completed its detailed design in February 2024 and unveiled it again in December 2025 with a total retail, hospitality and commercial area of 2.6 million sq m. Construction was under way and expected to be completed in three years.

Emaar describes a drive-through mall design, a full transport network and pedestrian streets, and a direct link to the planned Dubai Creek Tower. Dubai Creek Harbour itself is planned with 7.4 million sq m of residential space and 500,000 sq m of parks. For the homes around it, see Dubai Creek Harbour and Emaar Properties.

Ghaf Woods Mall, E311

Majid Al Futtaim announced Ghaf Woods Mall in October 2025 as its new flagship in Dubai. It sits on Sheikh Mohammed Bin Zayed Road (E311) inside Ghaf Woods, the group's AED 15.4 billion residential community, and is planned as a forest-integrated centre that combines shopping, dining and entertainment with planting.

It will be Majid Al Futtaim's 30th mall and its 19th in the UAE. The opening date is to be confirmed. Homes in Ghaf Woods, such as Capria and Cilia, are on our Majid Al Futtaim page.

The Majid Al Futtaim mall in Dubai South

In May 2026 Dubai South and Majid Al Futtaim signed an agreement to develop an AED 62 billion mixed-use master community in Dubai South, near Al Maktoum International Airport. It will cover 22 million sq ft and will be anchored by a large shopping mall.

The name, size and opening date of the mall are to be confirmed. This is the furthest from opening of the projects on this page, but it is the one most closely tied to the airport's growth. The first phase of Al Maktoum International is expected in 2032.

04Which communities are getting their own mall?

Four master communities have a named community mall announced or open: Nad Al Sheba Gardens, Sobha Hartland, Dubai South and Palm Jebel Ali. These are smaller centres built around a supermarket and daily services, for the people who live there.

The Grand, Nad Al Sheba Gardens

Shamal Holding, owner of Nad Al Sheba Gardens, named the community's centre The Grand and announced it as fully leased ahead of opening in phases from 19 August 2026. It is anchored by Waitrose & Partners, the first in Nad Al Sheba, with retail, dining, wellness and everyday services opening in phases. Fitcode and American Hospital are due in early 2027 to complete the health and wellness offer.

The community is a Meraas villa and townhouse development near Meydan. See our Nad Al Sheba Gardens page and the upcoming Phase 12.

Sobha Mall, Sobha Hartland

Sobha Realty announced an AED 210 million mall inside Sobha Hartland, its community in Mohammed Bin Rashid City. It has a built-up area of about 339,000 sq ft and a gross leasable area of about 115,000 sq ft, with 35 shops and food outlets and more than 10 dining options.

Plans include a supermarket, a gym, play courts and an indoor entertainment area, and the mall was scheduled for completion in the second half of 2026. Homes nearby include Sobha Hartland II, Riverside Crescent and Skyvue.

South Bay Mall, Dubai South

Dubai South Properties announced South Bay Mall in November 2025 as its first retail and lifestyle centre, in the Dubai South Residential District. It covers about 200,000 sq ft over ground, first and rooftop levels, with 60 retail units, two anchor stores and a food hall.

It will also have a clubhouse, a gym, a spa, a clinic and parking for more than 400 cars. The mall serves South Bay, a waterfront community of more than 800 villas and townhouses and more than 200 waterfront mansions around a lagoon about a kilometre long. Projects by the developer are on our Dubai South Properties page.

The Yard, Palm Jebel Ali

The Yard is Palm Jebel Ali's first retail and lifestyle destination, announced by Dubai Retail in September 2026 and scheduled to open in 2027. It will have about 70,000 sq ft of lettable space and 26 concepts across retail, dining, wellness and healthcare, for about 20,000 residents.

Named tenants include Waitrose, American Hospital, a nursery and Bateel Café, and McLaren Construction is the main contractor. It is built on the waterfront with open terraces and a link to a promenade. Homes on the island, such as the Frond F villas and Palm Central Private Residences, are on our Palm Jebel Ali page.

Retail planned inside other new communities

Several master plans include their own town centres, though without a named mall yet:

  • Emaar South: 53,000 sq m of retail and dining in the plan, around an 18-hole golf course.
  • The Valley: a 32,000 sq m town centre on the Dubai to Al Ain Road.
  • Tilal Al Ghaf: Majid Al Futtaim's lagoon community in Dubailand, beside the developer's Ghaf Woods.

For a guide to the newest communities themselves, see Dubai's newest communities and where they are.

05Which existing malls are expanding?

The two largest existing malls, the Dubai Mall and Mall of the Emirates, both have major investment programmes. For buyers in Downtown and Al Barsha, these change what is on the doorstep more than a new mall elsewhere would.

The Dubai Mall

Emaar announced an AED 1.5 billion expansion of the Dubai Mall in June 2024, adding 240 new luxury stores and food and beverage outlets. The contractor was mobilising on site at the time. The mall already measures 1.2 million sq m and has more than 1,200 retail outlets.

The completion date is to be confirmed. Homes in the area are on our Downtown Dubai page.

Mall of the Emirates

Majid Al Futtaim announced an AED 5 billion transformation of Mall of the Emirates in April 2025, for the mall's 20th anniversary. It adds 20,000 sq m of retail space and 100 new stores across luxury, fashion and lifestyle.

AED 1.1 billion had already been allocated to a wellness club, a cultural hub with a 600-seat theatre, a dining precinct and road and access works with the Roads and Transport Authority. Four new entertainment concepts are due by late 2026, and the mall's first outdoor food and beverage courtyard is set for early 2027.

06Which off-plan projects are near the new malls?

The communities closest to a new mall with a 2027 date are Jumeirah Village Triangle, beside Skylight Mall, and Palm Jebel Ali, home to The Yard. These tables show what we track in each, updated as we add projects.

Jumeirah Village Triangle, beside Skylight Mall:

7 off-plan projects in Jumeirah Village Triangle (JVT) on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
S1LVIANA Park LivingObject 1Apartment · CommercialOn requestOn requestOn requestSelling
Fashionz by DanubeDanube PropertiesApartment · Branded residenceAED 827K10/10/10/70Jun 2027Selling
ELAR1S RISEObject 1Apartment · CommercialOn requestOn request2028Selling
Binghatti LuxuriaBinghatti DevelopersApartmentAED 1.25M20/50/30Q3 2027Selling
Interstellar TowerMr. Eight DevelopmentApartment · CommercialAED 1.12M20/30/50Q3 2028Selling
Sky Gate TowerTiger PropertiesApartment · DuplexAED 600KOn requestOn requestSelling
Volga TowerTiger PropertiesApartmentAED 1.5MOn requestOn requestSelling

Palm Jebel Ali, home of The Yard:

2 off-plan projects in Palm Jebel Ali on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Frond F, Palm Jebel AliNakheelVillaOn requestOn request2027Selling
Palm Central Private ResidencesNakheelApartment · TownhouseAED 2.7M20/50/30Sep 2030New launch

Dubai South, home of South Bay Mall and the planned Majid Al Futtaim mall:

46 off-plan projects in Dubai South on OffPlan Insider, November 2026, newest 20 shown. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Divine ElementsTakmeel Real Estate DevelopmentApartmentAED 600K20/20/60On requestSelling
Vivida ResidencesNamo DevelopmentApartmentAED 680K5/30/65Q1 2028New launch
Lincoln Star Residence IVLincoln Star GroupApartmentOn requestOn requestQ2 2028Pre-launch
Avenew 888Avenew DevelopmentApartment · DuplexAED 1.45M10/50/40Q1 2028Selling
WAADA by BT PropertiesBT PropertiesApartment · Townhouse · VillaOn request70/30Q4 2028Under construction
Calisi by ZoyaZoya DevelopmentsApartmentOn requestOn requestQ3 2027Under construction
Galleria ResidencesEvera DevelopmentApartmentAED 809K30/70Dec 2027Under construction
X11 by BAMXBAMX DevelopmentsApartmentAED 920KOn requestQ4 2028New launch
Elinor by ZoyaZoya DevelopmentsApartmentAED 647K20/25/5/50Q3 2028New launch
Miorah by ZoyaZoya DevelopmentsApartmentOn requestOn requestQ2 2027Selling
TesseraAl Ghurair DevelopmentApartment · DuplexAED 2.1M35/65Q2 2028New launch
Al Ghaf JanoubJersey Real Estate DevelopmentApartment · CommercialOn requestOn requestOn requestPre-launch
Enre Residence by ImtiazImtiaz DevelopmentsApartmentOn request20/40/40Q1 2028Under construction
Samana Hills South 3Samana DevelopersApartmentAED 999KOn requestQ4 2028Selling
Samana South HavenSamana DevelopersApartmentAED 599KOn requestQ2 2029Selling
Samana South Haven 2Samana DevelopersApartmentAED 644KOn requestOn requestNew launch
Cresswell HomesMerath DevelopmentApartmentOn requestOn requestOn requestSelling
Azizi Venice 6Azizi DevelopmentsApartmentAED 705K10/10/10/10/60On requestSelling
Monaco MansionsAzizi DevelopmentsVillaAED 45M10/70/20Dec 2026Selling
Coventry 49GFS DevelopmentsApartmentAED 633K20/24/20/36Q2 2028Selling

For Dubai Creek Harbour, Mohammed Bin Rashid City and Nad Al Sheba, open the area pages linked above.

07Should a new mall change where you buy?

It should be one input, not the reason. A mall makes daily life easier and is something tenants ask about, but the home itself, the price, the payment plan and the handover date matter more.

Use these checks before you count a planned mall in your decision:

  1. How far is it from your building? Measure the walk or the drive from the tower or villa cluster, not from the community gate. A mall at the other end of a large master plan can be a ten-minute drive.
  2. Does it open before or after your handover? If your home hands over in 2027 and the mall is due in 2027, plan for a year in which it may not be open yet. Filter homes by handover year.
  3. What stage is it at? An owner's announcement with a named contractor or an opening phase is firmer than a masterplan drawing. Ask the developer what is built.
  4. Is it a community centre or a destination mall? A community centre brings a supermarket and services. A destination mall brings traffic too. Both have trade-offs for the homes next to them.
  5. What else is on the way? Schools, clinics, the Metro and roads usually matter more day to day. Our guide to family communities and schools covers schools, and Dubai's areas and districts compares the areas.

Once you have a shortlist, check the project and the developer properly: registration, escrow and construction progress. The steps are in how to check an off-plan project and developer, and how to buy off-plan property in Dubai covers the purchase itself.

08Key terms

  • Gross leasable area (GLA): the floor space let to tenants. The best figure for comparing how much shopping a mall will have.
  • Built-up area: the total floor area of the building, including corridors, plant rooms and often parking.
  • Anchor: a large tenant, usually a supermarket or department store, that draws visitors to the rest of the mall.
  • Community mall: a smaller centre built mainly for one master community, with a supermarket, pharmacy, clinic and cafés.
  • Super-regional mall: a large mall built to draw shoppers from across the city, such as Skylight Mall.
  • Master community: a planned development by one master developer, with its own roads, parks and retail, such as Nad Al Sheba Gardens or Emaar South.

Tell us which mall or community you are interested in, and we will send the homes nearby that fit your budget, with today's availability and the handover date checked for each.

ProjectsProjects mentioned in this guide.

FAQQuestions buyers ask.

What new malls are opening in Dubai?

Announced new malls include Skylight Mall on Al Khail Road and The Yard on Palm Jebel Ali, both due in 2027, and Dubai Square at Dubai Creek Harbour, expected about three years from December 2025.

Sobha Mall in Sobha Hartland was scheduled for the second half of 2026, and The Grand in Nad Al Sheba Gardens began opening in phases in August 2026. South Bay Mall, Ghaf Woods Mall and a Majid Al Futtaim mall in Dubai South have opening dates to be confirmed.

What is the biggest new mall in Dubai?

By lettable shop space, Skylight Mall on Al Khail Road is the largest new mall with an opening year: 1.3 million sq ft of gross leasable area and more than 360 stores, due in 2027. Dubai Square at Dubai Creek Harbour is larger as a whole development, at 2.6 million sq m of retail, hospitality and commercial area, but that figure covers more than shops.

Where is Skylight Mall in Dubai?

On Al Khail Road, beside Jumeirah Village Triangle, Jumeirah Islands and The Springs. It is being developed by Dubai Retail, part of Dubai Holding Asset Management, and is scheduled to open in 2027.

When will Dubai Square open?

Emaar said in December 2025 that construction of Dubai Square was under way and expected to be completed in three years, which points to about the end of 2028. It sits at Dubai Creek Harbour and is planned with a drive-through mall design and a link to the Dubai Creek Tower.

Is there a mall on Palm Jebel Ali?

Yes, one is planned. The Yard, by Dubai Retail, is scheduled to open in 2027 as Palm Jebel Ali's first retail and lifestyle destination, with about 70,000 sq ft of lettable space and 26 concepts, including Waitrose and American Hospital.

Is the Dubai Mall being expanded?

Yes. Emaar announced an AED 1.5 billion expansion of the Dubai Mall in June 2024, adding 240 new luxury retail and dining options, with the contractor mobilising on site at the time. A completion date is to be confirmed.

Does a new mall raise property prices nearby?

We do not forecast prices. A mall within a short drive is one of the things tenants and owner-occupiers look for, so it can make a home easier to live in or let. Whether that shows in prices depends on the building, the supply around it and the wider market.

How often is this page updated?

We update it when an owner announces a new mall, a name, a contractor or an opening date. The project table at the end changes every time we add or revise a project. The infographics are dated 4 November 2026.

Sources & methodWhere these figures come from.

Sources

  1. dubaiholding.com: Dubai retail announces skylight mall a new super regional mall opening in 2027
  2. mediaoffice.ae: Dubai retail unveils the yard
  3. emaar.com: Emaar unveils dubai square
  4. emaar.com: Emaar unveils dubai square a futuristic fusion of cutting edge retail entertainment and technology in dubai creek harbour
  5. emaar.com: Emaar announces aed 1 5 billion expansion of dubai mall
  6. majidalfuttaim.com: Majid al futtaim announces aed 5 billion transformation of mall of the emirates to redefine retail and lifestyle experiences
  7. majidalfuttaim.com: Pr_majid al futtaim announces aed 5 billion investment to transform moe_en.pdf
  8. majidalfuttaim.com: Majid al futtaim announces ghaf woods mall
  9. dubaisouth.ae: Dubai south and majid al futtaim partner to develop aed 62 billion mixed use master community
  10. mediaoffice.ae: Dubai south and majid al futtaim
  11. mediaoffice.ae: Dubai south properties unveils south bay mall
  12. sobharealty.com: Sobha realty announces aed 210 million mall project within hartland
  13. zawya.com: Shamal unveils the grand a curated retail and lifestyle destination at nad al sheba gardens 413383
  14. mediaoffice.ae: Al maktoum international airport
  15. emaar.com: Emaar south
  16. emaar.com: The valley

What we could not verify

  • Opening dates are the owners' stated targets: 2027 for Skylight Mall and The Yard, about three years from December 2025 for Dubai Square and the second half of 2026 for Sobha Mall. We could not confirm on 4 November 2026 whether Sobha Mall has opened, or whether every phase of The Grand opened on schedule.
  • Opening dates for the Dubai Mall expansion, South Bay Mall, Ghaf Woods Mall and the Majid Al Futtaim mall in the new Dubai South community were not stated in the announcements we read. They are shown as to be confirmed.
  • Sizes are as each owner states them and are not like for like: Skylight Mall and The Yard give gross leasable area, Sobha Mall gives built-up area and lettable area, South Bay Mall gives a total area, and Dubai Square's 2.6 million sq m covers retail, hospitality and commercial space together.

4 Nov 2026 · Reviewed by OffPlan Insider Research. First published 4 Nov 2026, updated 9 Nov 2026. Data: mall announcements as published by their owners up to 4 November 2026; the project tables are from OffPlan Insider project data on the date this page was last updated.

Want options that fit your budget?

Tell us your budget and what the property is for. We check live prices, plans and availability with the developers and send the options that fit.

  1. Share your budgetAnd what the property is for
  2. We check with developersPrices, plans and availability
  3. You reserve directBooking and SPA are with the developer

No consultation fee · You book directly with the developer