Skip to content
OffPlan Insider
Guide · Buying processReviewed 4 Nov 2026

Dubai off-plan launches announced for 2027: what is officially confirmed so far

The Dubai communities, phases and pre-launch projects officially announced by developers and government that lead into 2027, the dates already fixed for that year, and how to tell an announced launch from a rumour. No forecasts and no unconfirmed lists.

OffPlan Insider ResearchWritten and reviewed by the research desk
Published 4 Nov 202611 min read31 sources cited
The short answer

As of 4 November 2026, the officially announced pipeline for 2027 is mostly master communities and later phases rather than dated launches. Confirmed so far are Aldar's 8,000-home Greenwoods near Dubai Silicon Oasis (the first 1,500 homes due to launch by the end of 2026, two more phases to follow), an AED 62 billion Majid Al Futtaim community in Dubai South, further releases on Palm Jebel Ali and Dubai Islands, Nakheel's Palm Springs, and Meraas's Nad Al Sheba Gardens Phase 12. Exact sales dates for 2027 are on request from each developer.

Key takeaways

  1. Few developers fix a sales date a year ahead. What is officially announced for 2027 is mostly communities and phases that will keep releasing homes after 2026.
  2. The largest announced pipelines are Aldar's Greenwoods (8,000 homes in three phases), Majid Al Futtaim's AED 62 billion community in Dubai South, Palm Jebel Ali and Dubai Islands from Nakheel, and Dubai Creek Harbour and Emaar South from Emaar.
  3. Several projects are announced but not yet on sale, including Nakheel's Palm Springs, Nad Al Sheba Gardens Phase 12, Dana at Expo Valley Views and Solaya 8. Their launch dates are on request.
  4. Dated for 2027 already: Skylight Mall and The Yard open, the Dubai Islands shoreline works finish in the fourth quarter, and Etihad Rail's Sharjah station opens on 30 March.
  5. Dubai registered about 104 new projects worth more than AED 100 billion in the first half of 2026, and land sales reached AED 146 billion by late October. That is the pool 2027 launches come from.
  6. An off-plan project can only be sold once it is registered and has an escrow account. Treat any 2027 list without a developer or government source as a rumour.

Searches for Dubai's 2027 launches turn up long lists of project names. Most of them are not launches at all: they are plots that have been sold, renders shared on social media, or names a broker has heard. This guide keeps only what a developer or the Government of Dubai has announced, and shows what stage each one is at.

The short version: as of 4 November 2026, what is officially announced for 2027 is mostly communities and later phases, not dated launches. Developers fix a sales date a few weeks ahead, through a registration of interest. So the useful question is not "what launches on which day in 2027?" but "which announced communities will be releasing homes in 2027, and what is already fixed for that year?"

Jump to: what counts as announced, the announced pipeline, pre-launch projects, what is dated for 2027, the numbers, how to prepare.

01What counts as an announced launch?

A launch is announced when the developer, the master developer or a government body says so in its own name. On this page that means a developer press release or website, Dubai Media Office, WAM or the Dubai Land Department.

A project goes through five stages before you can buy it. Only the last one is a launch.

Five stages from land sale to launch in Dubai: first, land changes hands and the plot sale is registered with the Dubai Land Department, which is not a launch; second, a masterplan or partnership is announced, naming the community, its size and partners, usually without prices; third, the project is named and registered, because off-plan sales need the project registered and an escrow account opened; fourth, an expression of interest, a registration list sometimes with a deposit before the final price list, with terms that vary; fifth, the sales launch with a price list, payment plan and sale and purchase agreement, registered on Oqood. A note says that on this page announced means stages two to five, stated by the developer or a government body, and that broker lists and social posts are not counted.
Most projects you will hear about for 2027 are at stage 1 or 2. Stages 3 to 5 are where you can act.

Stage 3 is the legal gate. Under Law No. 8 of 2007, a developer may sell units off-plan only once the project is registered and an escrow account has been opened for buyers' payments. Each sale is then recorded on the Dubai Land Department's interim register, known as Oqood, under Law No. 13 of 2008.

That gives you a simple test. If nobody can tell you the project's registration and escrow details, it is not yet a launch, whatever the brochure says.

02Which Dubai communities are announced to release homes after 2026?

Eight master communities have announced plans that run beyond 2026, with homes still to come. These are where most 2027 releases will come from, but the timing of each release is on request from the developer.

Community Master developer What is announced Stage at 4 November 2026
Greenwoods, near Dubai Silicon Oasis Aldar with Dubai Holding 8,000 townhouses and villas in three phases First 1,500 homes due by the end of 2026; two phases to follow
Dubai South community Majid Al Futtaim with Dubai South AED 62 billion, 22 million sq ft, anchored by a large mall Agreement signed May 2026; name and phases to be confirmed
Palm Jebel Ali Nakheel Seven islands, 16 fronds, 90 km of beachfront Villas and apartments selling in releases
Dubai Islands Nakheel Five islands, 18.6 sq km Homes selling; infrastructure and beach works under way
Palm Springs, Hessyan Nakheel Townhouses and villas around a lagoon Pre-launch; details on request
Ghaf Woods, Dubailand Majid Al Futtaim AED 15.4 billion forest community with its own mall Neighbourhoods selling; more to come
Dubai Creek Harbour Emaar 7.4 million sq m of residential space around Dubai Square Towers launching in sequence
Emaar South Emaar 22,700 homes around a golf course Releases continuing

Greenwoods by Aldar

Aldar and Dubai Holding expanded their joint venture in February 2026 with AED 38 billion of new developments in Dubai. Greenwoods is the largest community named so far: 8,000 townhouses and villas near Dubai Silicon Oasis, in three phases, on the route of the Metro Blue Line.

The first 1,500 homes are due to launch by the end of 2026 on a 55/45 plan. The later phases are the clearest example of an announced community that will keep releasing homes in 2027 and beyond. Prices and phase dates are on request; register on the Greenwoods page.

Majid Al Futtaim's community in Dubai South

Dubai South and Majid Al Futtaim signed an agreement in May 2026 to develop an AED 62 billion mixed-use master community near Al Maktoum International Airport. It will cover 22 million sq ft and be anchored by a large shopping mall, with homes, retail and lifestyle uses.

The name, the first phase and its launch date are to be confirmed. Until then, the homes on sale in the district are on our Dubai South page, and the developer's other communities are on our Majid Al Futtaim page.

Palm Jebel Ali and Dubai Islands

Nakheel relaunched Palm Jebel Ali in 2023 and releases homes in batches. In June 2026 it released the next phase of Palm Central Private Residences, and in August 2026 it released 44 beachfront villas on Frond F. The island's first retail centre, The Yard, is due in 2027.

On Dubai Islands, Nakheel awarded an AED 527 million infrastructure contract for Island B in April 2026 and is selling Bay Estate townhouses and villas on the lagoons. Our news story on the Bay Grove Residences contract covers the latest construction award.

Ghaf Woods, Dubai Creek Harbour and Emaar South

These three are already selling and keep adding buildings. Capria and Cilia are on sale in Ghaf Woods. At Dubai Creek Harbour, Emaar's newest tower is Valia, and Dubai Square is expected to be completed about three years from December 2025.

At Emaar South, Emaar plans 22,700 homes, and the Golf-prefixed releases are the latest. Our Emaar Properties and Nakheel pages list every project we track from each.

03Which projects are announced but not yet on sale?

Several named projects are at stage 3 or 4: announced by the developer, sometimes registered, but without a public price list. These are the ones closest to a launch.

Project Developer Where What is known
Palm Springs Nakheel Hessyan, Jebel Ali Townhouses and villas around a lagoon; registrations of interest open
Nad Al Sheba Gardens Phase 12 Meraas Nad Al Sheba 97 villas, registered with the Dubai Land Department, handover August 2029
Dana at Expo Valley Views Expo City Dubai Expo City Dubai Two and three bedroom apartments; handover 31 October 2029
Solaya 8 Meraas Solaya, Jumeirah 1 One of nine beachfront buildings at Solaya
Greenwoods Aldar Near Dubai Silicon Oasis Townhouses and villas; 55/45 plan
Binghatti Starfall Binghatti Al Jaddaf Apartments near Al Jadaf Metro station

Nad Al Sheba Gardens Phase 12 is a good example of stage 3. It has a Dubai Land Department project number, a set number of villas and a handover month, but the sales release is still to come.

The full, current list of pre-launch projects we track is on upcoming projects. Once a project's price list is out it moves to new launches.

04What is officially dated for 2027?

The dates already fixed for 2027 are openings and works, not sales launches. They matter because they change what is built around homes launching that year.

Timeline of official milestones dated for 2027 in Dubai: early 2027, the Mall of the Emirates outdoor courtyard, part of Majid Al Futtaim's AED 5 billion transformation; early 2027, Fitcode and American Hospital at The Grand, completing the Nad Al Sheba Gardens retail centre; 30 March 2027, Etihad Rail's Sharjah station, the next published passenger opening after Dubai; 2027, The Yard opens on Palm Jebel Ali with 26 concepts, the island's first retail centre; 2027, Skylight Mall opens on Al Khail Road with 1.3 million sq ft beside JVT and The Springs; 2027, Aldar expects up to 4,500 handovers, including its first Dubai handovers at Haven; fourth quarter of 2027, the Dubai Islands shoreline works complete, with 3 km of shoreline upgraded and 320 metres of new beach. Two later milestones are shown: the Metro Blue Line, due in 2029, through Dubai Silicon Oasis and Dubai Creek Harbour, and the first phase of Al Maktoum International in 2032 at about 150 million passengers a year.
Openings and works with a stated 2027 date, with two later milestones that shape where homes are launched.

What each one means:

  • Two new malls. Skylight Mall opens on Al Khail Road in 2027 with more than 360 stores, beside Jumeirah Village Triangle. The Yard opens on Palm Jebel Ali the same year. Our guide to new malls in Dubai lists every announced mall.
  • The Dubai Islands shoreline. Nakheel's contract to upgrade 3 km of the western shoreline of Island B and add 320 metres of new beach is due to finish in the fourth quarter of 2027.
  • Rail. Etihad Rail's passenger service reached Dubai at Al Yalayis Station on 30 September 2026. Sharjah station is next on the published schedule, on 30 March 2027. See our story on the Al Yalayis station.
  • Handovers. Aldar expects to hand over up to 4,500 homes in 2027 across its business, including its first Dubai homes at Haven. Every project we track that is due that year is on handover 2027.

Two later dates shape where launches happen. The Metro Blue Line is due in 2029, with stations including Dubai Silicon Oasis and Dubai Creek Harbour. The first phase of Al Maktoum International, at about 150 million passengers a year, is expected in 2032.

05How big is the pipeline behind 2027 launches?

Large. The Government of Dubai counts AED 1.1 trillion of real estate projects due by 2030, covering about 350,000 homes. Registered projects and land sales in 2026 show how much of that is already moving.

Six official figures behind 2027 launches in Dubai: AED 1.1 trillion of real estate projects due by 2030 within AED 2.1 trillion of projects under way, Dubai Media Office, October 2026; about 350,000 homes in the housing programme to 2030; 104 new projects worth more than AED 100 billion registered in the first half of 2026, adding more than 24,000 homes, with more than 150 since, Dubai Land Department; AED 146 billion of land across 10,770 plot sales in 2026 to 26 October, 61 per cent of the value residential; an AED 62 billion community by Dubai South and Majid Al Futtaim covering 22 million sq ft near Al Maktoum International, May 2026; and 8,000 homes at Aldar's Greenwoods in three phases near Dubai Silicon Oasis, with 1,500 due to launch in 2026. A note says registered projects and sold land are the pipeline 2027 launches come from, and that a figure is not a launch date.
Official figures published in 2026. None of them is a launch date.

The numbers in context:

  • AED 2.1 trillion of projects under way. Dubai Media Office reported in October 2026 that AED 1.1 trillion of this is real estate due by 2030, with about 350,000 homes. See our story on the AED 2.1 trillion pipeline.
  • New projects registered. The Dubai Land Department reported about 104 new projects worth more than AED 100 billion in the first half of 2026, adding more than 24,000 homes, and more than 150 projects by October. See 104 new projects in the first half.
  • Land sold. Land sales reached AED 146 billion across 10,770 plots by 26 October 2026, with residential land 61% of the value. Me'aisem 2, Al Yelayiss 5 and Palm Jebel Ali led by value. A land sale is not a launch, but it shows where developers have bought. See land sales in 2026.
  • Where the city is planning homes. In October 2026 Dubai's Executive Council approved an Urban Centres Development Plan of 48 centres around mass transit, aiming to raise the share of residents living near a Metro station from 52% to 74% by 2040. See the urban centres plan.

More supply means more choice at launch, and more finished homes competing for tenants and buyers later. Look at what is handing over around a project in the same years, on handover 2028 and later.

06What does a launch announcement tell you, and what does it leave out?

A launch announcement tells you that a project exists, roughly where it is and who is building it. It rarely tells you everything you need to decide. Read it as the start of your questions, not the end.

What an announcement usually gives you:

  • The developer and the master community. This tells you who is responsible for delivery and which rules of the community apply.
  • The home types and a starting price. The starting price is normally the smallest home on a low floor. It is a floor, not an average.
  • The headline payment plan. For example 60/40 or a post-handover plan. The full schedule, with dates and milestones, is in the sale and purchase agreement.
  • An indicative handover date. Usually a quarter or a year. The SPA sets the date that counts and any allowed delay.

What it usually leaves out, and you should ask for:

  • The exact unit, its size and its view. Ask for the floor plan, the floor and the orientation of the unit you are offered.
  • The project registration and escrow account. Ask for both before you pay more than a refundable amount.
  • Service charges. Ask for the estimated annual charge per square foot and how cooling is billed.
  • What is in the price. Furnishing, appliances, parking spaces and any fee waivers vary by launch. Current waivers are on our offers page.
  • What is built nearby by your handover. Schools, shops and transport often arrive in phases. Ask which ones are due before you move in.

A later release in the same community may come at a different price and on a different plan. That is normal phasing, not a reason to rush or to wait on its own. Compare each release on its own terms: the unit, the plan, the handover date and the total cost.

07How to prepare for a 2027 launch

Decide what you want before the launch, not at it. Launch days move quickly, and the buyers who do well are the ones who already know their area, budget and plan.

  1. Choose the area and home type first. Our guides to Dubai's areas and districts and Dubai's newest communities help you narrow it to two or three places.
  2. Set the budget including fees. Add the 4% Dubai Land Department fee and other buying costs to the price. The true cost of buying off-plan lists them.
  3. Pick the payment plan you can carry. Launch plans vary widely. Compare structures in off-plan payment plans in the UAE and on our payment plans page.
  4. Register interest, then read the terms. Ask whether any deposit is refundable, whether it holds a unit or a place in the queue, and which company receives it.
  5. Check registration and escrow before you sign. Ask for the project's Dubai Land Department registration and the escrow account details, and make payments only into that account. The steps are in how to check an off-plan project and developer.
  6. Read the SPA. Check the handover date, the allowed delay, the specification and what happens if a payment is late. Off-plan buyer protection in Dubai explains the rules.

08Launch or resale: which suits you?

A launch suits a buyer who wants the first choice of units and a long payment plan, and can wait for handover. A resale or a nearly finished home suits a buyer who needs keys soon or wants to see the building first.

Buying at launch Buying later in the build Buying near handover
Choice of unit Widest Narrower What is left or resale
What you can see Renders, plans, show unit Construction under way A nearly finished building
Payment plan Longest Shorter Mostly due at handover
Wait for keys Longest Medium Shortest

Our guide to off-plan versus ready property compares the two in full, and projects near handover lists homes that complete soonest.

09Key terms

  • Launch: the release of a price list and payment plan, with sales contracts signed and registered.
  • Pre-launch: a project the developer has named and announced, before the price list is public.
  • Expression of interest (EOI): a registration, sometimes with a deposit, that places you on the developer's list before launch.
  • Escrow account: a bank account for a single project into which buyers' payments go, released to the developer as construction progresses, under Law No. 8 of 2007.
  • Oqood: the Dubai Land Department's interim register for off-plan sales.
  • Phase: a group of buildings or plots released together within a larger community.

Tell us the area, budget and home type you have in mind, and we will tell you when a matching launch is announced, with the plan and registration checked before you commit.

ProjectsProjects mentioned in this guide.

FAQQuestions buyers ask.

What off-plan launches are coming in Dubai in 2027?

Officially announced so far are later phases of large communities rather than dated launches: Aldar's Greenwoods near Dubai Silicon Oasis, Majid Al Futtaim's AED 62 billion community in Dubai South, Palm Jebel Ali and Dubai Islands from Nakheel, Dubai Creek Harbour and Emaar South from Emaar, and pre-launch projects such as Nakheel's Palm Springs and Nad Al Sheba Gardens Phase 12. Sales dates are on request from each developer.

Has any developer announced a launch date for 2027?

Not in the official announcements we tracked up to 4 November 2026. Developers usually fix a launch date weeks before it, through a registration of interest. What they have announced is the communities and phases those launches will come from.

What is Greenwoods by Aldar?

A new Aldar community near Dubai Silicon Oasis, developed in partnership with Dubai Holding. It is planned for 8,000 townhouses and villas in three phases, with the first 1,500 homes due to launch by the end of 2026, on the route of the Metro Blue Line. Later phases will follow the first.

What is the Majid Al Futtaim community in Dubai South?

An AED 62 billion mixed-use master community agreed between Dubai South and Majid Al Futtaim in May 2026. It will cover 22 million sq ft near Al Maktoum International Airport, with homes, retail and lifestyle uses anchored by a large shopping mall. Its name, phases and launch dates are to be confirmed.

Is it better to buy at launch or wait?

A first release usually gives the widest choice of units and layouts, but less is known about the finished community. Waiting gives more information and fewer choices. Decide on the area, home type, budget and handover date first, then judge each launch against them.

What is an expression of interest (EOI)?

A registration, sometimes with a deposit, that puts you on a developer's list before the price list is released. Terms vary. Ask in writing whether the amount is refundable, whether it reserves a specific unit or only a place in the queue, and which company receives the money.

How can I check that a launch is real?

Look for the announcement on the developer's own site or from Dubai Media Office or WAM, then ask for the project's Dubai Land Department registration and escrow details before you pay anything beyond a refundable deposit. Our guide to checking an off-plan project and developer lists the steps.

Which projects hand over in 2027?

Projects due for handover in 2027 are a different list from 2027 launches. Our 2027 handover page lists the off-plan projects we track with a 2027 completion date, updated as we add projects.

Sources & methodWhere these figures come from.

Sources

  1. aldar.com: Aldar and dubai holding expand strategic joint venture
  2. The National: Aldar to launch major dubai villa and townhouse project by end of year
  3. dubaisouth.ae: Dubai south and majid al futtaim partner to develop aed 62 billion mixed use master community
  4. mediaoffice.ae: Dubai south and majid al futtaim
  5. majidalfuttaim.com: Majid al futtaim announces ghaf woods mall
  6. ghafwoods.com: Capria
  7. nakheel.com: Nakheel unveils limited collection of 44 beachfront villas on palm jebel ali s frond f
  8. nakheel.com: Nakheel releases next phase of palm central private residences amid accelerating demand for beachfront living on palm jebel ali
  9. nakheel.com: Nakheel awards aed 527 million infrastructure contract for island b at dubai islands
  10. bayestate.nakheel.com
  11. nakheel.com
  12. meraas.com: Project listing
  13. expocitydubai.com: Expo valley views
  14. solaya.meraas.com
  15. emaar.com: Emaar south
  16. emaar.com: Valia at dubai creek harbour
  17. emaar.com: Emaar unveils dubai square
  18. mediaoffice.ae: Mohammed bin rashid during the mohammed bin rashid leaders forum
  19. mediaoffice.ae: Dubai retail unveils the yard
  20. dubaiholding.com: Dubai retail announces skylight mall a new super regional mall opening in 2027
  21. majidalfuttaim.com: Pr_majid al futtaim announces aed 5 billion investment to transform moe_en.pdf
  22. zawya.com: Shamal unveils the grand a curated retail and lifestyle destination at nad al sheba gardens 413383
  23. wam.ae: Blywk7v etihad rail launch passenger services 2026
  24. Khaleej Times: Dubai islands to get stunning new beach as 3km shoreline undergoes upgrade by 2027
  25. Khaleej Times: Dubai real estate projects dh100 billion first half 2026
  26. gulftoday.ae: 10770 plots of land in dubai sold for dhs146 billion in 2026
  27. The National: Dubai sheikh hamdan urban centres development plan
  28. mediaoffice.ae: Al maktoum international airport
  29. rta.ae
  30. Dubai Legislation Portal: Law No. (8) of 2007
  31. Dubai Legislation Portal: Law No. (13) of 2008

What we could not verify

  • No developer announcement we read up to 4 November 2026 gives a calendar date for a Dubai sales launch in 2027. The communities and phases listed are announced, but the month any of them releases homes is on request from the developer.
  • Greenwoods' 8,000 homes, three phases, first 1,500 homes due by the end of 2026 and 55/45 plan come from our project page, built on Aldar's February 2026 joint-venture release and Aldar's comments to The National on 14 October 2026. The phase-two and phase-three release dates are on request.
  • The Dubai Islands shoreline completion in the fourth quarter of 2027, the Dubai Land Department's first-half 2026 project figures and the 2026 land sales total are taken from press reports of official data (Khaleej Times and Gulf Today), not from a government page we opened. The Urban Centres plan figures are from The National's report of the Executive Council decision.

4 Nov 2026 · Reviewed by OffPlan Insider Research. First published 4 Nov 2026. Data: official announcements up to 4 November 2026; project status and handover dates are from OffPlan Insider project data on the date this page was last updated.

Want options that fit your budget?

Tell us your budget and what the property is for. We check live prices, plans and availability with the developers and send the options that fit.

  1. Share your budgetAnd what the property is for
  2. We check with developersPrices, plans and availability
  3. You reserve directBooking and SPA are with the developer

No consultation fee · You book directly with the developer