How buying off-plan in Abu Dhabi works from launch to title deed: which rulebook applies, what the developer must have before selling, the disclosure statement, interim registration on DARI, what Law No. 3 of 2015 does with your money, how Abu Dhabi payment plans are shaped, handover, resale, and where the launches are.

OffPlan Insider ResearchWritten and reviewed by the research desk
Published 5 Nov 202615 min read15 sources cited
The short answer

Buying Abu Dhabi off-plan means buying a home before it is built under Abu Dhabi Law No. 3 of 2015, regulated by ADREC everywhere except Al Reem and Al Maryah islands, which follow ADGM's rules. Before you sign, the developer must give you a regulator-approved disclosure statement; the sale then goes on the Interim Real Estate Register through DARI and TAMM, with a 2% registration fee, and is not binding until it is registered. Every payment goes into the project's escrow account, which the developer cannot draw on before 20% of construction without bank guarantees. Most Abu Dhabi plans leave half the price or more to handover, and launches are concentrated on Al Reem, Yas, Al Raha Beach, Saadiyat and Masdar City.

Key takeaways

  1. Two rulebooks: most of the emirate follows Law No. 3 of 2015, amended by Law No. 2 of 2025, under ADREC; Al Reem and Al Maryah islands follow ADGM's Off-Plan Development Regulations 2024 and register on ADGM's AccessRP platform.
  2. A developer needs a written ADREC permit before it advertises an off-plan project, and six conditions, including an escrow account and an approved disclosure statement, before it can sell a single unit.
  3. The disclosure statement must include the plans, a schedule of finishes, a two-year service fee budget and the estimated delivery date. If it is not given, you can ask to terminate.
  4. The sale must go on the Interim Real Estate Register. The seller should apply straight after signing; after 21 days you can apply yourself, and late registration carries an AED 10,000 fine on the seller.
  5. Escrow money can be used only for construction and project finance. Nothing can be drawn before 20% of construction unless the developer posts bank guarantees worth at least 20% of the construction works.
  6. Across 28 Abu Dhabi projects we track with a published plan, 22 leave 50% or more of the price to handover, so plan how you will fund the final payment before you book.
  7. At completion the developer must apply to transfer your unit to the Real Estate Register within 21 days of your final payment; if it does not, you or your lender can ask the regulator to do it.

Buying Abu Dhabi off-plan means agreeing to buy a home before it is finished, under rules written specifically for that risk. This guide follows one purchase from launch day to title deed: which rules apply, what the developer must have in place, what you sign, where your money goes, how the plans are shaped and what happens at handover.

If you are new to buying in the emirate, start with buying property in Abu Dhabi as a foreigner, which covers who can own where, every fee and the Golden Visa. This guide goes deeper on the off-plan part. For the regulator itself, see ADREC explained, and for every area and project, our Abu Dhabi page.

01What does off-plan mean under Abu Dhabi law?

An off-plan sale is a contract that gives you property rights over a unit that exists only on the approved plans. Abu Dhabi treats it as its own kind of transaction, with its own register, its own bank account rules and its own handover procedure.

The main law is Law No. 3 of 2015 on the regulation of the real estate sector, amended by Law No. 2 of 2025. Its implementing decisions fill in the detail: Administrative Decision No. 246 of 2015 on the Interim Real Estate Register, and three 2025 decisions on escrow drawdowns, jointly owned property and refunds when a sale is cancelled. ADREC, the Abu Dhabi Real Estate Centre, publishes all of them in its rules and regulations library.

Seven stages of an Abu Dhabi off-plan purchase under Law No. 3 of 2015 and its implementing decisions, outside ADGM. One, expression of interest or reservation: launches often open with a refundable EOI, then a reservation and booking payment. Two, disclosure statement: a signed, regulator-approved statement of the unit, plans, finishes, service fee budget and delivery date. Three, sale and purchase agreement: the payment plan, handover date, size and default terms in writing. Four, Interim Real Estate Register: the seller registers it; after 21 days the buyer can; late registration carries an AED 10,000 fine on the seller. Five, payments into escrow: every instalment into the project account, with no drawdown before 20% of construction. Six, completion certificate issued by the municipality, with plans deposited with ADREC within 60 days. Seven, title deed: transfer to the Real Estate Register applied for within 21 days of full payment.
The seven stages of an Abu Dhabi off-plan purchase. Each is explained below.

02Which rules apply: ADREC or ADGM?

It depends on the address. Most of the emirate follows ADREC's rules; Al Reem Island and Al Maryah Island are inside Abu Dhabi Global Market (ADGM), which has its own property regulations and register.

Two cards comparing Abu Dhabi's property rulebooks. Most of the emirate, including Yas, Saadiyat, Al Raha Beach, Masdar City, Hudayriyat, Ramhan, Fahid, Al Jurf and Ghantoot: ADREC and DARI, under Law No. 3 of 2015 amended in 2025, with the Interim Real Estate Register, a 2% registration fee, escrow with no drawdown before 20% of construction, and the rent freeze from 2 June 2026. ADGM, covering Al Reem Island and Al Maryah Island: the ADGM Registration Authority, under the Off-Plan Development Regulations 2024, registered on ADGM's AccessRP platform, with fees and project account rules to be confirmed with ADGM and the developer, and the rent freeze not applying.
The address decides the rulebook. Ask which one applies before you pay a deposit.

Cabinet Resolution No. 41 of 2023 extended ADGM's jurisdiction to Al Reem Island alongside Al Maryah, and Al Reem's register moved to ADGM's Registration Authority on 1 January 2025. ADGM issued its own Off-Plan Development Regulations 2024 covering off-plan sales, project accounts and the registration of developers and projects, with transactions on its AccessRP platform.

That matters because Al Reem is where the largest number of Abu Dhabi off-plan projects we track are being sold. The principles are similar, but the register, the fees and the platform differ. Our guides to living in Al Reem Island and living in Al Maryah Island set out the ADGM process. The rest of this guide describes the ADREC rules that apply everywhere else.

03What must a developer have before selling off-plan?

A permit to advertise, and six conditions before it sells. You can check most of them yourself.

The advertising permit. Under Article 14 of Law No. 3 of 2015, a developer may not advertise an off-plan project in local or foreign media, or show it at an exhibition, without ADREC's written permit. A developer that markets through a broker must register the brokerage contract.

The six conditions. Article 15 says no unit may be sold off-plan until all of these are in place:

The six conditions in Article 15 of Law No. 3 of 2015, and how a buyer checks each.
Condition under Article 15What you can check
Approval of the project by the competent authoritiesThe project's registration on DARI
The development plan, with initial floor and compound plans, deposited with the registerThe draft plan in your disclosure statement
A property or contractual right over the land that lets the developer build and sellAsk who owns the land and on what basis
Proof that the developer owns the landAsk for it; a sub-developer also needs the master developer's consent
A project escrow account openedThe escrow details on DARI, matched to your contract
The regulator's approval of the disclosure statementA signed statement in your hands before you sign

If a salesperson asks for money before the project is registered, or wants a payment to an account that is not the project's escrow account, stop. The law makes no exception for an early booking.

04How do Abu Dhabi launches work?

Large Abu Dhabi launches usually run in stages: an expression of interest (EOI), a priority or VIP sale, then the public launch. The EOI is a deposit that holds your place in the queue to choose a unit; it is not yet a purchase.

Modon's Wadeem Gardens on Hudayriyat Island is a typical example: an AED 50,000 EOI from 18 to 28 September 2026, VIP sales on 29 September and the launch on 1 October. Aldar's Sei Saadiyat and Talay both launched in September 2026.

The laws reviewed for this guide do not regulate EOIs as such, so the terms are the developer's. Before you pay one, get in writing:

  • Is it refundable, in full, if you do not buy, and how quickly?
  • Does it fix anything: a price, a unit, a position in the queue?
  • Who holds the money, and is it credited to your booking if you buy?
  • When does the sale and purchase agreement follow, and when is the sale registered?

From the reservation onwards the statutory protections apply: the disclosure statement, the register and escrow. See today's releases on new launches.

05What is in the disclosure statement?

It is the developer's signed, regulator-approved description of what you are buying, and you must receive it before you sign. Article 42 of Administrative Decision No. 25 of 2025 lists what it must contain.

  • The project. Land uses in the building or community, facilities in the common areas, any special use of your unit such as serviced apartments, and any sustainability features.
  • The plans. The compound or sub-development plan, the building or compound management regulation, and a draft floor or compound plan showing your unit's area.
  • The finishes. A schedule of materials and finishes for your unit and the common areas.
  • The running costs. A budget for the first two financial years after completion, and an estimate of the service fees for your unit in those years.
  • The dates. An estimated construction start, if work has not begun, and an estimated delivery date.
  • The register. A statement that you must register the purchase on the Interim Real Estate Register, and what happens if you do not.

Why it matters to you. If the developer does not provide the statement, you can ask to terminate the contract. If any of it proves materially inaccurate or incomplete within two years of the unit being transferred to you, the developer is liable for the damage you suffer. Keep it with your contract.

06How does interim registration on DARI work?

Every off-plan sale goes on the Interim Real Estate Register, which ADREC keeps through DARI and TAMM. Under Article 27 of Law No. 3 of 2015, the sale is not binding on you, the developer or anyone else until it is registered.

Who applies, and when. Administrative Decision No. 246 of 2015 puts the duty on the seller, usually the developer, immediately after the contract is signed. If the seller has not registered within 21 days, you can apply yourself and recover the cost from the seller, deducting it from the price if necessary. A seller who registers late can be fined AED 10,000.

What the application contains. The contract date, the parties, the price, the project's name and registration number, the expected completion date and the unit's details, with a signed copy of the contract and the fee receipt.

Your documents. For an individual buyer: a valid passport, and for a UAE resident a residence visa and Emirates ID, or for a non-resident an identification document the regulator accepts, plus an address, phone number and an email the regulator can use for notices. A company buyer adds its licence, constitution, shareholder details and a board resolution naming its signatory.

What you get. Once registered, ADREC notifies both parties of the registration and the registered contract number. Keep that notice with the contract; it is your proof that the sale binds.

The fee. The registration fee is 2% of the price, split equally between buyer and seller unless the contract says otherwise, with a TAMM electronic fee of AED 450. A developer cannot add its own registration fees: Article 16 limits it to an administration fee within the regulator's cap, set at AED 5,000. The worked costs are in buying property in Abu Dhabi as a foreigner.

07What does Law No. 3 of 2015 do with your money?

It ring-fences it in a project escrow account and limits what the developer can spend it on. These are the provisions a buyer relies on.

  • One account per project, and per phase. Article 18 requires an escrow account for each project; a project built in stages needs one for each stage. Every payment you make, and every payment your lender makes, goes into it.
  • Only for the project. Escrow money may pay only for building the project and its finance. It may not pay for the land or for broker commission.
  • Nothing before 20%. The developer cannot draw on the account until at least 20% of construction is complete. Administrative Decision No. 24 of 2025 allows earlier drawdowns only against bank guarantees worth at least 20% of the construction works, backed by an engineering report no more than 30 days old.
  • Brokers pay in too. A broker who markets the project must deposit the price into the escrow account and may not take commission out of it first.
  • The developer's lender pays in. If the developer borrows against the land to build, the bank must pay the loan into escrow, not to the developer, and your unit is released from that mortgage once you have paid in full.
  • Safe from creditors. Escrow funds cannot be seized by the developer's creditors, except in the cases the law lists, such as a cancelled or abandoned project.
  • Open to you. Anyone who has paid into the account can see its statements held by the bank and take copies. The bank reports to the regulator every three months.
  • A defects reserve. At least 5% of the project's value stays in the account for a year after the completion certificate.

What escrow does not do is guarantee the price, the rent or the handover date. ADREC's powers when a project is late or fails, and its procedure if a buyer stops paying, are set out in ADREC explained.

08How are Abu Dhabi payment plans shaped?

Weighted towards handover. Of the 28 Abu Dhabi projects we track with a published plan, 22 leave half the price or more to pay at handover, and the most common split is 50/50.

Bar chart of the share of the price due on handover across 28 Abu Dhabi off-plan projects tracked by OffPlan Insider with a published payment plan, on 5 November 2026: 30% at handover, 1 project; 35%, 1; 40%, 3; 45%, 1; 50%, 12; 55%, 1; 60%, 5; 65%, 1; 70%, 2; 75%, 1. 22 of the 28 plans leave half the price or more to pay at handover.
Share of the price due at handover across the Abu Dhabi projects we track with a published plan, 5 November 2026.

What the law says. Article 15 of Law No. 3 of 2015 says the buyer pays according to the actual completion of construction, unless agreed otherwise with the developer. Article 17 lists a developer's refusal to link payments to construction stages as a fundamental breach. Most contracts do agree a schedule, so read whether your instalments fall due on dates or at construction milestones.

Booking amounts are low. Five per cent on booking is the most common first payment in the plans we track, with several at 10%. Remember that the 2% registration fee and any administration fee fall due when the sale is registered, alongside the deposit.

The handover payment is large. On a 50/50 plan, an AED 2 million apartment leaves AED 1 million to pay at handover. The Central Bank caps an off-plan mortgage at 50% of the property's value, and banks set their own terms on top, so check early how much a lender would advance at handover and what you would need in cash.

Extended plans. Some Abu Dhabi plans push most of the price to the end through a mortgage. Wadeem Gardens, for example, takes five instalments of 5% and then 75% in April 2031. That keeps the cash you commit during construction low, but the final payment depends on finance being available when it falls due.

The Golden Visa. For an off-plan home, Abu Dhabi asks for proof that at least AED 2 million has already been paid to the developer, on a property worth at least AED 2 million. On a handover-weighted plan you may qualify only late in the build. See the Golden Visa and UAE property.

Compare structures on our payment plans page and in off-plan payment plans in the UAE, and borrowing in off-plan mortgages in the UAE.

09Where are Abu Dhabi's off-plan launches concentrated?

On the islands and the waterfront. Of the 73 Abu Dhabi projects we tracked on 5 November 2026, about two-thirds were in five areas: Al Reem Island, Yas Island, Al Raha Beach, the Saadiyat Cultural District and Masdar City.

Bar chart of the 73 Abu Dhabi off-plan projects tracked by OffPlan Insider on 5 November 2026, across 17 areas: Al Reem Island 17 (ADGM register); Yas Island 12; Al Raha Beach 8; Saadiyat Cultural District 6; Masdar City 6; Al Maryah Island 4 (ADGM register); Fahid Island 3; Ramhan Island 3; Sobha City in Al Bahiya 3; Zayed City 3; Hudayriyat Island 2; and six other areas with one project each.
Abu Dhabi projects we track by area, 5 November 2026. The tables below update as projects are added.

The tables below list every project we track in those five areas, with today's starting price, payment plan and handover date.

Al Reem Island

Abu Dhabi's tower district beside downtown, mostly apartments, and inside ADGM, so sales are registered on AccessRP. See living in Al Reem Island.

16 off-plan projects in Al Reem Island on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Radiant Marina TowersRadiant Real EstateApartmentOn requestOn requestDec 2027Under construction
A1LA ResidenceObject 1Apartment · DuplexOn requestOn requestQ4 2028Selling
ONE ResidenceOne DevelopmentApartment · DuplexAED 1.49M50/502028Selling
Radiant Waves TowerRadiant Real EstateApartment · DuplexOn requestOn requestQ1 2029Selling
Rixos Al Reem ResidencesEast & West PropertiesApartment · Branded residenceOn requestOn requestOn requestUnder construction
Bab Al Qasr Royal Residence 28Burtville DevelopmentsApartment · Duplex · Branded residenceOn requestOn requestQ4 2029Under construction
Flow25GAF PropertyApartment · Penthouse · DuplexOn request10/40/50Apr 2029Selling
Radiant Bridges TowersRadiant Real EstateApartment · Duplex · CommercialOn requestOn requestQ2 2029Selling
Radiant TerraceRadiant Real EstateApartment · DuplexOn requestOn requestQ3 2029Selling
The Artery ResidencesIMKAN PropertiesApartment · DuplexOn requestOn requestOn requestNew launch
Bab Al Qasr Beach Resort Residence 77Burtville DevelopmentsApartment · Duplex · Penthouse · Branded residenceOn requestOn requestQ4 2031Selling
Riviera Residences Phase 2MEREDApartment · Villa · Duplex · PenthouseOn request5/45/50On requestNew launch
Vista 3 by ReportageReportage PropertiesApartment · PenthouseAED 835KOn requestOn requestUnder construction
Marlin IconReportage PropertiesApartment · Duplex · PenthouseOn requestOn requestOn requestSelling
Marlin II by ReportageReportage PropertiesApartmentAED 1.6MOn requestOn requestSelling
The District by ReportageReportage PropertiesApartment · Duplex · Penthouse · TownhouseAED 4.38MOn requestOn requestSelling

Yas Island

The leisure island beside Zayed International Airport, with apartments, townhouses and villas. See living in Yas Island.

11 off-plan projects in Yas Island on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Stellar by Elie SaabEmirates DevelopmentsBranded residence · Apartment · Villa · PenthouseOn requestOn requestOn requestSelling
The Bay Residence 2Baraka Real Estate DevelopmentApartment · Townhouse · PenthouseOn requestOn requestOn requestSelling
The Orchids at Yas AcresAldar PropertiesTownhouse · VillaAED 8MOn requestQ1 2031Pre-launch
Bab Al Qasr Residence 31Burtville DevelopmentsApartment · Duplex · Branded residenceOn requestOn requestQ1 2029Under construction
Manchester City Yas Residences by Ohana Phase 2Ohana DevelopmentTownhouse · Duplex · Villa · Branded residenceOn request5/30/652029New launch
Perla 2 (Perla Waves) by ReportageReportage PropertiesApartment · DuplexAED 1.9MOn requestOn requestNear handover
Sama YasAldar PropertiesApartment · Duplex · PenthouseAED 5.91M5/55/40Feb 2028Selling
Aldar Yas Riva ReserveAldar PropertiesVillaAED 7.9MOn requestOn requestNew launch
Manchester City Yas Residences by OhanaOhana DevelopmentVilla · Townhouse · Apartment · Penthouse · Branded residenceOn requestOn request2029Selling
The WadiReportage PropertiesApartmentAED 750KOn requestOn requestNew launch
Yas Park PlaceAldar PropertiesApartment · DuplexOn requestOn requestQ1 2030Selling

Al Raha Beach

The waterfront district between the city and Yas, mostly apartments and some townhouses. See living in Al Raha Beach.

7 off-plan projects in Al Raha Beach on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Bab Al Qasr Canal View Residence 22Burtville DevelopmentsApartment · Duplex · Branded residenceOn requestOn requestQ2 2029Under construction
Hilton Residences Abu Dhabi Al RahaEmirates DevelopmentsBranded residence · Apartment · Townhouse · PenthouseOn requestOn requestOn requestSelling
Brabus IslandReportage PropertiesApartment · Villa · Townhouse · Penthouse · Branded residenceOn requestOn requestOn requestSelling
Bab Al Qasr Sea View Residence 51Burtville DevelopmentsApartment · Duplex · Townhouse · Branded residenceOn requestOn requestQ4 2029Under construction
Juman 2ICT Real Estate DevelopmentApartmentAED 3.47MOn requestOn requestSelling
Luluat Marina at Luluat Al RahaICT Real Estate DevelopmentApartment · DuplexAED 2.8M3/42/55On requestSelling
Baia by ReportageReportage PropertiesTownhouseAED 3.9MOn requestOn requestSelling

Saadiyat Cultural District

The museum district on Saadiyat Island, with prime and branded apartments. See our Saadiyat Island buyer's guide.

6 off-plan projects in Saadiyat Cultural District on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Sensi by ReportageReportage PropertiesApartment · TownhouseAED 2.8MOn requestOn requestSelling
Mamsha PalmAldar PropertiesApartment · DuplexAED 48.32M5/25/70Q1 2028Selling
Nobu Residences Abu DhabiAldar PropertiesApartment · Duplex · Penthouse · Branded residenceAED 8.3M25/45/30Aug 2027Selling
Mandarin Oriental Residences, Saadiyat Cultural DistrictAldar PropertiesApartment · Penthouse · Branded residenceAED 7.29M10/55/35Q3 2028Selling
Sei SaadiyatAldar PropertiesApartmentAED 2.95M5/45/50Dec 2030New launch
The Row SaadiyatAldar PropertiesApartmentOn requestOn requestOn requestSelling

Masdar City

The low-carbon district near the airport, with some of the emirate's lowest entry prices. See living in Masdar City.

5 off-plan projects in Masdar City on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Fay ValleyTarafVilla · TownhouseAED 3.14M5/35/60Q2 2030Selling
Bab Al Qasr Garden Residence 65Burtville DevelopmentsApartment · Duplex · Penthouse · Branded residenceOn requestOn requestQ1 2030Under construction
Royal Park by ReportageReportage PropertiesApartment · Penthouse · TownhouseAED 720KOn requestOn requestUnder construction
Plaza 2 by ReportageReportage PropertiesApartment · TownhouseAED 500KOn requestOn requestUnder construction
Sila by ReportageReportage PropertiesApartment · TownhouseAED 2.8MOn requestOn requestSelling

Outside these five, newer coastal and island destinations are opening up: Hudayriyat Island, Ramhan Island, Fahid Island, and Al Jurf and Ghantoot on the coast towards Dubai. Inland, Zayed City and Al Shamkha offer villa communities. For the official rents in each area, see Abu Dhabi rents by area.

10What happens at handover?

Handover in Abu Dhabi is a sequence: the building is certified, the plans are registered, you pay the balance and your unit moves to the main register with a title deed.

  1. Completion certificate. The municipality issues a completion certificate once the project is built according to its permits. The developer must tell you the date of the building works' completion and of that certificate, and you can rely on the certificate's date for your legal guarantees.
  2. Plans registered. Within 60 days of the certificate, the developer must deposit the final floor or compound plans with ADREC, which can extend that by up to 30 days.
  3. Size check. Your unit's final area is compared with the contracted area. Under 5% difference changes nothing; between 5% and 10% the price moves in proportion; over 10% you can choose to pay or cancel if larger, or take the reduction or cancel if smaller.
  4. Final payment and inspection. You pay the balance due on handover and inspect the unit. Until it is delivered, the developer bears the unit's running costs, under Article 38 of Administrative Decision No. 25 of 2025, and if it collects service charge money before the completion certificate, it may do so no more than three months before the money is due to be spent.
  5. Transfer to the Real Estate Register. Within 21 days of your final payment, the developer must apply to transfer the unit into your name. TAMM lists AED 900 plus AED 50 for the transfer.
  6. If the developer does not transfer. You or your lender can ask the regulator to enforce it. The developer then has 21 days to explain, after which the regulator can transfer the unit itself, with the developer bearing the cost unless agreed otherwise.

After handover. The developer must repair defects under the law's guarantees without charging them to owners or the management company, and the 5% retention stays in escrow for a year. If a delivery slips more than six months beyond the developer's committed schedule, ADREC may impose a delay penalty paid to buyers, unless the delay was beyond the developer's control.

Snag the unit carefully and in writing before you accept the keys; the checklist in our handover process guide works in Abu Dhabi too, though the registers and fees differ.

11Can you sell before completion?

Yes. Units on the Interim Real Estate Register can be sold, mortgaged or otherwise disposed of under Article 29 of Law No. 3 of 2015 and Article 8 of Administrative Decision No. 246 of 2015.

  • It is a new registration. A resale is a new disposition and must itself go on the Interim Real Estate Register, with the registration fee, before it binds.
  • Pass on the disclosure statement. Before you sign a resale, you must give the new buyer a full copy of your disclosure statement. If you do not, the new buyer can ask to terminate.
  • Check the developer's conditions. Developers set their own requirements before they allow a resale, often a minimum share of the price paid and a no-objection letter. Modon, for example, allows resale at Hudayriyat Golf Estates once at least 20% has been paid. Read your contract before you buy if an early exit is part of the plan.
  • Settle any mortgage. A lender registered on the unit must consent or be repaid.

12What if you cannot keep paying?

The developer must follow a set procedure before it can cancel your purchase: notice to pay within 60 days, notice to ADREC, and an attempt at an amicable settlement. Only then can your name be removed from the register and the unit resold after 30 days.

What the developer may keep depends on how complete the project is, under Administrative Decision No. 165 of 2025, and the rest is refunded from escrow. The steps and the deduction table are set out in ADREC explained. If you see trouble coming, talk to the developer early; a resale or a revised schedule is usually better than a termination.

13Checklist before you pay

  • The address is under ADREC or ADGM, and you know which register your sale goes on.
  • The project is registered on DARI, with an escrow account and a completion rate.
  • The advert carries a permit, and the person selling holds an ADREC licence.
  • Any EOI terms are in writing: refundable, what it fixes, who holds the money.
  • You have a signed disclosure statement with the plans, finishes, two-year service fee estimate and delivery date.
  • The agreement says who pays the 2% fee, the administration fee and the delay terms.
  • Every payment goes to the project's escrow account, never to an individual.
  • The sale is on the Interim Real Estate Register, and you have the registration notice.
  • You know how you will fund the handover payment, and when you reach any Golden Visa threshold.
  • You know the developer's resale conditions if you might sell early.

14Key terms

  • ADREC. The Abu Dhabi Real Estate Centre, the emirate's property regulator, within the Department of Municipalities and Transport.
  • ADGM. Abu Dhabi Global Market, the financial free zone covering Al Maryah and Al Reem islands, with its own property register.
  • DARI. ADREC's platform for projects, escrow details, completion rates and transactions.
  • TAMM. The Abu Dhabi government services portal, through which registrations are filed and fees paid.
  • Interim Real Estate Register. The register of off-plan sales, resales and mortgages before completion.
  • Disclosure statement. The developer's signed, regulator-approved description of the unit and project, given before you sign.
  • Escrow account. The project's bank account, managed by an approved bank, into which all buyers' payments go.
  • Completion certificate. The municipality's certificate that the project is built according to its permits.
  • EOI. An expression of interest: a deposit to join the queue at a launch, on the developer's terms.

15Where to go next

Tell us your budget and what you want the home for, and we will send the Abu Dhabi off-plan projects that fit, with today's availability checked.

On live projectsSee these plans on live projects.

Compare payment plans side by side for projects with a verified schedule.

FAQQuestions buyers ask.

Can foreigners buy off-plan property in Abu Dhabi?

Yes, inside Abu Dhabi's investment zones, which include Yas, Saadiyat, Al Raha Beach, Masdar City, Hudayriyat and the ADGM islands of Al Reem and Al Maryah. Any nationality can buy, and you do not need to live in the UAE. The off-plan sale is registered with ADREC, or with ADGM on Al Reem and Al Maryah.

Is buying off-plan in Abu Dhabi safe?

The law protects your money and your contract. Each project must have an escrow account, the developer cannot draw on it before 20% of construction unless it posts guarantees, 5% of the project value is held back for a year after completion, and a sale is not binding until it is on the Interim Real Estate Register. The law does not protect the resale price or rent.

What is the Interim Real Estate Register?

The register ADREC keeps for every sale, resale and mortgage of a unit sold off-plan. Under Article 27 of Law No. 3 of 2015, an off-plan sale is not binding on the parties or anyone else until it is registered there. At completion the unit moves to the main Real Estate Register and you receive a title deed.

How do I register an off-plan purchase on DARI?

The seller, usually the developer, applies through DARI and TAMM straight after the contract is signed, with the signed contract, proof that the fee is paid and the buyer's details. A non-resident buyer gives a passport copy and an accepted identification document. If the seller has not registered within 21 days, the buyer can apply and recover the cost.

What fees do I pay when buying off-plan in Abu Dhabi?

A 2% registration fee, split between buyer and seller unless the contract says otherwise, a TAMM electronic fee of AED 450, a developer administration fee capped at AED 5,000, and AED 900 plus AED 50 to transfer to the main register at handover. Confirm the current amounts on TAMM before you pay.

Can a developer use my payments before the building is started?

Not for anything other than the project. Escrow money can pay only for construction and project finance, never for the land or broker commission, and nothing can be drawn before 20% of construction unless the developer gives ADREC bank guarantees worth at least 20% of the construction works.

Can I sell an Abu Dhabi off-plan property before handover?

Yes. Units on the Interim Real Estate Register can be resold or mortgaged. The resale is registered as a new transaction, and you must hand the new buyer a full copy of your disclosure statement. Developers set their own conditions, such as a minimum share of the price paid, so check your contract.

What happens if an Abu Dhabi off-plan project is delayed?

If delivery is more than six months later than the schedule the developer committed to, ADREC may impose a delay penalty paid to buyers, unless the delay was beyond the developer's control. If a project does not start and buyers of at least 5% of sold units complain, the regulator can investigate and cancel it, returning escrow money.

Where are most off-plan projects in Abu Dhabi?

On the islands and the waterfront. Of the 73 Abu Dhabi projects we tracked on 5 November 2026, Al Reem Island had 17, Yas Island 12, Al Raha Beach 8, and the Saadiyat Cultural District and Masdar City 6 each.

Sources & methodWhere these figures come from.

Sources

  1. adrec.gov.ae: Regulations
  2. adrec.gov.ae: Property ownership
  3. adrec.gov.ae: Faqs
  4. adrec.gov.ae: Developer journey
  5. adrec.gov.ae: Press 27 adrec H1 2026 transaction report
  6. dari.ae
  7. tamm.abudhabi: RegistertheSaleofanOffPlanPlotorUnit
  8. tamm.abudhabi: TransferUnitfromInitialReregistertoRealEstateReregister
  9. tamm.abudhabi: RequesttoRegisteraUnitforFirstSale
  10. dmt.gov.ae: DMT Issues Regulatory Decisions to Enhance Transparency and Governance in Real Estate Sector
  11. adgm.com
  12. added.gov.ae: Visa for real estate investors
  13. Central Bank of the UAE Rulebook: Regulations regarding mortgage loans
  14. modon.com: Wadeem gardens
  15. modon.com: Hudayriyat golf estates

What we could not verify

  • ADGM's registration fees and project account rules for off-plan sales on Al Reem and Al Maryah are not given, because ADGM's regulation text could not be opened; ask the developer and ADGM's Registration Authority what applies before you pay.
  • Expressions of interest are not regulated as such in the laws reviewed; whether an EOI is refundable, and whether it fixes a price, depends on the developer's own terms, so get them in writing.
  • TAMM fee figures (the 2% fee, the AED 450 electronic fee and AED 900 plus AED 50 for the transfer) are restated from TAMM service pages as indexed and our earlier guide; confirm the current amounts on TAMM before paying.

5 Nov 2026 · Reviewed by OffPlan Insider Research. First published 5 Nov 2026, updated 9 Nov 2026. Data: laws and decisions as published in ADREC's rules and regulations library; payment-plan and project counts from OffPlan Insider project data on 5 November 2026.

Want projects whose plan fits your cash?

Tell us your budget and how you would like to pay. We check live schedules and availability with the developers and send the options that fit.

  1. Share your budgetAnd how much you can pay before handover
  2. We match the schedulesDeposit, trigger and handover balance
  3. You reserve directBooking and SPA are with the developer

No consultation fee · You book directly with the developer