Skip to content
OffPlan Insider
Guide · Buying processReviewed 4 Nov 2026

Living in Dubai Maritime City: a buyer's guide to the peninsula (2026)

What living in Dubai Maritime City is like: where the peninsula is, how you get around, schools and healthcare nearby, the homes being built, running costs, and how to buy off-plan there.

OffPlan Insider ResearchWritten and reviewed by the research desk
Published 4 Nov 202612 min read20 sources cited
The short answer

Living in Dubai Maritime City means living on a 249-hectare reclaimed peninsula between Port Rashid and the Dubai dry docks, run by DP World, with the sea on three sides and old Dubai a few minutes inland. It is about 1 km from Jumeirah Beach Road, 3 km from Sheikh Zayed Road and 10 km from Dubai International Airport. Homes are apartments in new waterfront towers, from studios to penthouses, most completing between 2026 and 2029, beside a working ship-repair yard and a growing office district.

Key takeaways

  1. Dubai Maritime City is a 249-hectare peninsula between Port Rashid and the dry docks, with a ship-repair area, a commercial district and new residential towers on the coastline.
  2. It is about 1 km from Jumeirah Beach Road, 3 km from Sheikh Zayed Road and 10 km from Dubai International Airport. Developers quote about 5 minutes to Al Ghubaiba Metro Station and 15 to 22 minutes to Downtown Dubai by car.
  3. Homes are apartments only: studios of about 395 to 472 sq ft, one-bedrooms of about 535 to 1,181 sq ft and two-bedrooms of about 1,057 to 2,052 sq ft, plus penthouses.
  4. BEYOND is building an 8 million sq ft waterfront masterplan in two districts, The Bay and The Forest, alongside towers by DAMAC, Danube, Deyaar, Kora and Prestige One.
  5. There are no schools or hospitals on the peninsula itself. KHDA-rated schools and major hospitals are in Jumeirah 1, Al Satwa, Al Raffa and Mankhool, a short drive away.
  6. Service charges are approved by RERA and published per building on the Dubai Land Department's Service Charge Index once a building is registered. Ask for the estimate before you book.
  7. Most towers complete between late 2026 and the end of 2029, so in the early years you will live beside active building sites.

01What is it like living in Dubai Maritime City?

Living in Dubai Maritime City means an apartment on a reclaimed peninsula with water on three sides, between the cruise port at Port Rashid and the dry docks. Old Dubai, the Jumeirah beaches and the business districts are all within a short drive, but the district itself is still being built.

The peninsula covers 249 hectares and is run by DP World. Part of it is a working maritime area of ship lifts, berths and repair yards. Another part is a commercial district of offices and shops. Along the coastline, new residential towers are rising, the largest group of them in BEYOND's waterfront masterplan.

This guide covers daily life and the practical side of buying. For every project, price and payment plan in one place, see our Dubai Maritime City area page.

02Where is Dubai Maritime City?

Dubai Maritime City sits on the Bur Dubai side of the city, on a peninsula between Port Rashid and the Dubai dry docks. It is about 1 km from Jumeirah Beach Road, 3 km from Sheikh Zayed Road and 10 km from Dubai International Airport.

A causeway links the peninsula to Al Mina Street and from there to the main road network. To the north is Port Rashid with the cruise terminals; to the east are Al Mina, Al Hudaiba and Al Satwa; to the south are Jumeirah 1 and the beaches. Across the water, The World Islands lie offshore.

The peninsula has its own regulator for building. Trakhees, the planning and development department of the Ports, Customs and Free Zone Corporation, issues planning consent and building permits and inspects buildings. Property sales are registered with the Dubai Land Department like anywhere else in Dubai.

03What is on the peninsula today?

Dubai Maritime City has three parts: an industrial maritime area, a commercial district and a residential waterfront. Each one shapes daily life in a different way.

Card graphic of the three parts of Dubai Maritime City. Industrial area: ship lifts, dry and wet berths, repair yards and workshops, a handling capacity of 1,000 vessels a year, up from 400, and upgraded ship lifts of 6,000 and 3,000 tonnes. Commercial district: Maritime Business Centre 2, opened in 2026, with 125 office units from 40 to 980 square metres, 78 per cent leased before it opened and 480 parking bays. Homes: BEYOND's 8 million square foot masterplan along the coastline with a beach lagoon, in The Bay district (Aria, Saria, Orise, Sensia, The Mural, Soulever and 31 Above) and The Forest district (Talea and Kanyon). Towers by DAMAC, Danube, Deyaar, Kora and Prestige One are also on the peninsula, which covers 249 hectares.
Dubai Maritime City in three parts. Figures from DP World, the Dubai Media Office and BEYOND.

The maritime area. In September 2024 DP World raised the peninsula's ship-handling capacity from 400 to 1,000 vessels a year, with upgraded 6,000-tonne and 3,000-tonne ship lifts. Ship repair, yacht building and refits happen here. If you are choosing a unit, look at which way it faces and how far it is from the yards.

The commercial district. Maritime Business Centre 2 opened in 2026. It has 125 office units from 40 to 980 sq m and 480 parking bays, and 78% of its space was leased before it opened. More than 280 businesses are registered in the district, so there is a weekday working population.

The residential waterfront. BEYOND's masterplan covers 8 million sq ft along the coastline. It is laid out in districts, The Cove, The Forest and The Promenade, with a podium-level beach lagoon and shaded walkways. Its projects sit in The Bay District (Aria, Saria, Orise, Sensia, The Mural, Soulever and 31 Above) and The Forest District (Talea and Kanyon). Other developers are building towers too: DAMAC, Danube, Deyaar, Kora Properties and Prestige One.

04How do you get around from Dubai Maritime City?

Most residents drive. The peninsula connects to Al Mina Street, and from there to Sheikh Rashid Road, Jumeirah Beach Road and Sheikh Zayed Road. There is no Metro station on the peninsula itself.

Schematic diagram of distances and drive times from Dubai Maritime City, a 249-hectare peninsula: Jumeirah Beach Road about 1 km, Sheikh Zayed Road about 3 km, Dubai International Airport about 10 km, Port Rashid Boat Station about 2 minutes, Al Ghubaiba Metro Station on the Green Line about 5 minutes, DIFC about 10 to 15 minutes, Downtown Dubai about 15 to 22 minutes and Mall of the Emirates about 20 to 25 minutes. Drive times are developers' figures and vary with traffic.
Distances are approximate road distances. Drive times are the developers' figures for their towers and vary with traffic.

By car. Developers on the peninsula quote about 10 to 15 minutes to DIFC, 15 to 22 minutes to Downtown Dubai and Burj Khalifa, 20 to 25 minutes to Mall of the Emirates and 15 to 23 minutes to Dubai International Airport. Al Maktoum International Airport, at Dubai South, is about 46 minutes. These are off-peak figures, so test the drive at your own commuting hours.

By Metro. The nearest station is Al Ghubaiba on the Green Line, about 5 minutes by car. BurJuman, where the Red and Green Lines cross, is about 6 minutes. A short taxi or bus ride to the station is part of a Metro commute from here.

By water. Port Rashid Boat Station is about 2 minutes by car and Dubai Cruise Terminal 2 about 3 minutes. The RTA's marine services run from stations along the Creek and the coast; check routes and timetables on the RTA's journey planner or the S'hail app.

On foot and by bike. Within the BEYOND masterplan, walking routes and promenades link the towers to the waterfront and the beach lagoon. Beyond the peninsula, Jumeirah Beach Road is about 1 km away.

05Which schools are near Dubai Maritime City?

There are no schools on the peninsula. The nearest KHDA-rated schools are in Jumeirah 1, Al Satwa, Al Raffa and Mankhool, a short drive inland. Ambassador School in Mankhool is about 5 minutes by car by one developer's figures.

KHDA-rated schools in the areas nearest Dubai Maritime City, from KHDA's school directory, checked 4 November 2026. Ratings may change when inspections resume in 2026-27.
SchoolArea (KHDA)CurriculumYear groupsKHDA overall rating
Jumeira Baccalaureate SchoolJumeira FirstInternational BaccalaureatePre-primary to Grade 12Very good, 2023-24
Ambassador SchoolMankhoolIndianPre-primary to Grade 12Very good, 2023-24
Citizens SchoolAl SatwaUKECC to Year 9Good, 2024-25
Al Shurooq Private SchoolJumeira FirstMinistry of EducationKG 1 to Grade 12Good, 2023-24
New Academy SchoolAl RaffaAmericanKG 1 to Grade 12Good, 2023-24
DEWA AcademyAl HudaibaMinistry of Education and BTECGrade 9 to Grade 12Good, 2023-24

KHDA paused full inspections after 2023-24, which is why most ratings carry that year. It has announced that quality assurance visits resume in the 2026-27 school year, so check each school's profile again before you apply. Each profile also has a fees fact sheet.

Popular schools in Dubai often have waiting lists, especially for older year groups. If you are buying off-plan with children, match the handover date to the school year and apply early. Our guide to off-plan family communities and schools explains how ratings, fees and admissions work.

06What about hospitals and clinics?

There is no hospital on the peninsula; the nearest are in Mankhool and Umm Hurair. Developers put Aster Hospital in Mankhool about 5 minutes away by car, and Rashid Hospital and American Hospital Dubai about 12 minutes each.

Rashid Hospital is run by the Dubai Health Authority. Private clinics, pharmacies and dental practices are spread through Al Satwa, Jumeirah 1, Al Raffa and Karama. For routine care, most residents will use a clinic within 10 minutes of home.

Check which hospitals your health insurance network covers before you choose a building. Network lists change, and an apartment five minutes from a hospital outside your network is less convenient than it looks.

07Where do you shop, eat and go outside?

Daily shopping, beaches and parks are all a short drive from the peninsula. Within the district, shops and cafés are opening with the new towers and the commercial district.

  • Shopping. BurJuman Centre is about 6 minutes away by car. City Walk is about 15 minutes, and Dubai Mall about 10 to 15. Supermarkets and smaller shops are in Al Satwa, Al Raffa and Jumeirah 1.
  • Old Dubai. Al Fahidi Historical Neighbourhood and the Al Seef waterfront on Dubai Creek are about 6 minutes away, and the Gold Souk in Deira about 8 to 15.
  • Beaches. Developers quote about 8 to 10 minutes to Jumeirah Beach and La Mer, and about 10 to 14 minutes to J1 Beach.
  • Parks. Zabeel Park is about 10 minutes away. Inside the BEYOND masterplan, The Forest District is planned around landscaped gardens, and the masterplan includes a beach lagoon at podium level.
  • Marinas. Some towers include a yacht berth or marina promenade. Ask whether a berth comes with the unit or is leased separately.

08What homes can you buy in Dubai Maritime City?

Every home on the peninsula is an apartment, from studios to penthouses. There are no villas or townhouses, although some towers include duplexes, podium-level chalets and sea-view penthouses.

Range chart of home sizes in Dubai Maritime City off-plan towers in November 2026: studios 395 to 472 square feet at Shahrukhz Residences including flex layouts; one-bedroom 535 to 1,181 square feet across Shahrukhz, Chelsea, Il Vento, Soulever and Mar Casa; two-bedroom 1,057 to 2,052 square feet across Shahrukhz, Kanyon, Talea, Il Vento, Mar Casa and Harbour Lights; three-bedroom 1,446 to 2,447 square feet across Shahrukhz, Soulever, Mar Casa and Il Vento; penthouses 2,594 to 5,830 square feet across Shahrukhz, Mar Casa and Il Vento. Royal, duplex and chalet layouts are left out.
Size ranges of standard layouts in the towers we track, from developer floor plans, November 2026.

Studios run from about 395 to 472 sq ft, including flexible layouts that can be furnished as a small one-bedroom. One-bedroom apartments run from about 535 to 1,181 sq ft, and two-bedrooms from about 1,057 to 2,052 sq ft. Three-bedrooms run from about 1,446 to 2,447 sq ft, and penthouses from about 2,594 to 5,830 sq ft.

Sizes overlap a lot between buildings. A large one-bedroom in one tower can be as big as a small two-bedroom in another, so compare floor plans and the price per square foot rather than the bedroom count.

Several towers are branded residences: Harbour Lights and Chelsea Residences by DAMAC, Hilton Residences Dubai Maritime City by Prestige One and Shahrukhz Residences by Danube. See branded residences for how they compare across Dubai.

09How much do homes cost, and what do you pay on top?

Prices on the peninsula start higher than in most inland areas. On our tracker in November 2026, studios started from about AED 1.65 million, one-bedrooms from about AED 2.3 million and two-bedrooms from about AED 3.8 million.

Within BEYOND's masterplan, Soulever one-bedrooms started from about AED 2.94 million, and Talea and Kanyon two-bedrooms from about AED 3.8 million and AED 3.89 million. Many developers here quote prices on request, so ask for the current price list for the unit you want. For budgets, see AED 1 million to 2 million, AED 2 million to 3 million and AED 3 million to 5 million.

On top of the price, budget for the 4% Dubai Land Department registration fee and the smaller registration and administration fees, paid at booking. Our guide to the true cost of buying off-plan in Dubai lists every fee from booking to handover.

Payment plans vary widely. On the towers we track, the share paid before handover runs from 20% to 60%. Harbour Lights asks 20% during construction and 80% on handover, Chelsea Residences 60/40, and Hilton Residences 20% on booking, 40% during construction and 40% on handover. Shahrukhz Residences asks 30% over the first 18 months and 70% on handover. Plans with a large handover payment need the funds, or a mortgage, ready on completion. Our guide to off-plan payment plans explains how each type works.

Golden Visa. A property worth at least AED 2 million can support an application for the ten-year Golden Visa, and many homes on the peninsula are above that figure. Our Golden Visa guide explains how off-plan property counts.

10What are the service charges in Dubai Maritime City?

Service charges are set per building and approved by RERA. Once a building is registered, its approved rate per square foot is published on the Dubai Land Department's Service Charge Index, and owners pay through the Mollak system.

Most residential towers on the peninsula are not yet complete, so the approved rate for your building may not exist yet. Ask the developer for its estimated service charge per square foot in writing before you book, and ask what it covers. Waterfront towers with pools, gyms, concierge, marina facilities and hotel-style services usually cost more to run than plain residential blocks.

Branded residences can carry an extra layer of cost for the brand's services. Ask whether those services are included in the service charge or billed separately. District cooling, where a building uses it, is also billed separately from electricity and water.

After handover, the charge covers security, cleaning, maintenance contracts, common-area utilities, insurance and a reserve fund. Our handover guide explains how service charges and building management work once you have the keys.

11What does it cost to rent in Dubai Maritime City?

Rents are checked through the Dubai Land Department's rental index, which gives an average rent for a specific building and unit type. Because most towers here are still under construction, there are few registered tenancies to compare yet.

If you plan to let the home, register each tenancy on Ejari. Rent increases at renewal are capped by Decree No. 43 of 2013, which links the permitted increase to how far the current rent sits below the index average. Short-term holiday letting needs a holiday home permit from Dubai's tourism authority, and some branded towers have their own rules on short lets.

Ask the developer whether the building allows holiday letting and whether there is a hotel-managed rental programme. Get the answer in writing, because it affects who can live in the building as well as what you can earn.

12Who does Dubai Maritime City suit?

Dubai Maritime City suits buyers who want a sea-facing apartment close to old Dubai, DIFC and Downtown, and who are comfortable living in a district that will keep growing for several years. It suits some households better than others.

A neutral guide to who the peninsula fits. Every household is different.
You are…What worksWhat to weigh
A professional working in DIFC, Downtown or Bur DubaiShort drives to the business districts; sea viewsNo Metro station on the peninsula; commute by car or taxi to the nearest station
A couple or single buyerStudios and one-bedrooms in towers with full amenitiesHigher starting prices than inland areas; check the service charge estimate
A familyLarge three-bedrooms and penthouses; beaches nearbyNo schools or parks of scale on the peninsula yet; school runs inland
A buyer who wants a finished neighbourhoodOld Dubai and Jumeirah are established and closeHandovers run to the end of 2029, so expect building work nearby for years
A buyer who loves boatsMarina promenades, yacht berths in some towers, a working maritime districtAsk whether berths are included; check the aspect relative to the ship-repair area

13Which off-plan projects are on sale in Dubai Maritime City?

The table below lists the off-plan towers we track on the peninsula, newest first. It updates as we add projects, so it always shows the current list.

10 off-plan projects in Dubai Maritime City on OffPlan Insider, November 2026. Sold-out projects are left out. Ask us for today's prices and availability.
ProjectDeveloperHomesFromPayment planHandoverStatus
Shahrukhz Residences by DanubeDanube PropertiesApartment · Penthouse · CommercialAED 1.65M10/10/5/5/70Dec 2029Pre-launch
Il VentoKora PropertiesApartment · PenthouseOn request40/60On requestSelling
Mar CasaDeyaarApartment · Duplex · PenthouseOn requestOn requestQ4 2026Under construction
Oceanz by DanubeDanube PropertiesApartmentAED 1.2MOn requestQ1 2027Under construction
Kanyon by BEYONDBEYOND DevelopmentsApartmentAED 3.89MOn requestQ2 2029Selling
Soulever by BEYONDBEYOND DevelopmentsApartment · Duplex · PenthouseAED 2.94MOn requestQ1 2029Selling
Talea by BEYONDBEYOND DevelopmentsApartment · PenthouseAED 3.8MOn request2028Selling
Chelsea Residences by DAMACDAMAC PropertiesApartment · Branded residenceAED 2.51M60/40Q4 2029Selling
Harbour Lights by DAMACDAMAC PropertiesApartment · Branded residenceAED 6.67M20/80Q2 2027Selling
Hilton Residences Dubai Maritime CityPrestige One DevelopmentsApartment · Penthouse · Branded residenceOn request20/40/40Q4 2029Selling

The first towers complete soon. Mar Casa by Deyaar has a fourth-quarter 2026 handover, and Oceanz by Danube is due in the first quarter of 2027. Later projects complete in 2028 and 2029; see handover in 2027 and handover in 2029 for the wider market. Il Vento by Kora Properties includes a yacht berth and marina promenades.

14How do you buy off-plan in Dubai Maritime City?

Buying off-plan here follows the same Dubai process as anywhere else: reserve, sign the sale and purchase agreement, pay into the project's escrow account and register on the Dubai Land Department's interim register, known as Oqood. A few checks matter more on this peninsula.

  1. Check the project's registration. Confirm that the project is registered with the Dubai Land Department and that your payments go into its escrow account. Our guide to checking an off-plan project and developer shows how.
  2. Confirm the ownership type. Ask the developer what title you will receive on completion and how it is registered.
  3. Look at the masterplan, not just the tower. Ask what will be built in front of your unit, and how close it is to the ship-repair area or roads.
  4. Get the service charge estimate in writing. Ask for the estimated rate per square foot and what it includes.
  5. Check the handover date and late-delivery terms. The SPA, not the brochure, sets the date that binds the developer.
  6. Plan the handover payment. If most of the price falls due on completion, line up the funds or a mortgage early.
  7. Ask about letting rules. Confirm whether holiday letting is allowed and whether there is a rental programme.

Our step-by-step guide to buying off-plan property in Dubai covers each stage in detail, from reservation to the title deed.

15Key terms

  • Trakhees. The planning and development department of the Ports, Customs and Free Zone Corporation, which permits and inspects buildings in Dubai Maritime City.
  • Oqood. The Dubai Land Department's interim register for off-plan sales. Your purchase is registered here until the building is complete.
  • Service Charge Index. The Dubai Land Department's published list of RERA-approved service charges for jointly owned buildings.
  • Mollak. The system through which service charges are billed and paid.
  • Ejari. Dubai's tenancy registration system. Every residential lease is registered here.
  • Branded residence. An apartment in a building carrying a hotel or luxury brand, often with services provided by that brand.

ProjectsProjects mentioned in this guide.

FAQQuestions buyers ask.

Where is Dubai Maritime City?

On a reclaimed peninsula on the Bur Dubai side of the city, between Port Rashid and the Dubai dry docks. It is about 1 km from Jumeirah Beach Road, 3 km from Sheikh Zayed Road and 10 km from Dubai International Airport, and is reached by road through Al Mina Street.

Is Dubai Maritime City a good place to live?

It suits people who want a sea-facing apartment close to old Dubai, DIFC and Downtown, and who are happy in a district that is still being built. It has no villas, no schools of its own and an active ship-repair area on part of the peninsula, so families and people who want a finished neighbourhood should weigh that.

How far is Dubai Maritime City from Downtown Dubai?

Developers on the peninsula quote about 15 to 22 minutes by car to Downtown Dubai and about 10 to 15 minutes to DIFC. Dubai International Airport is about 10 km away, which developers put at 15 to 23 minutes. Times vary with traffic.

Is there a Metro station in Dubai Maritime City?

Not on the peninsula. The nearest is Al Ghubaiba on the Green Line, which developers put about 5 minutes away by car, with BurJuman, where the Red and Green Lines meet, about 6 minutes away. Port Rashid Boat Station is about 2 minutes by car.

Can foreigners buy property in Dubai Maritime City?

The towers on sale there are marketed to buyers of all nationalities, and sales are registered with the Dubai Land Department. Ask the developer to confirm the ownership type on your unit before you sign, and check that the project is registered with the land department.

Who regulates building in Dubai Maritime City?

Trakhees, the planning and development arm of the Ports, Customs and Free Zone Corporation, handles planning consent, building permits and inspections. Sales and off-plan registration go through the Dubai Land Department, as in the rest of Dubai.

What schools are near Dubai Maritime City?

The nearest KHDA-rated schools are in Jumeirah 1, Al Satwa, Al Raffa and Mankhool. They include Jumeira Baccalaureate School and Ambassador School, both rated Very good, and Citizens School, Al Shurooq Private School and New Academy School, rated Good.

When will the homes in Dubai Maritime City be finished?

Handover dates on the towers we track run from the fourth quarter of 2026 to December 2029. The project table on this page shows each one; the sale and purchase agreement for your unit sets the date that binds the developer.

Sources & methodWhere these figures come from.

Sources

  1. dubaimaritimecity.com
  2. mediaoffice.ae: Dubai maritime city boosts ship
  3. mediaoffice.ae: Dubai maritime city inaugurates aed 160 million maritime business centre
  4. dpworld.com: Dubai maritime city inaugurates aed 160 million maritime business centre
  5. pcfc.ae: Trakhees Rules and Regulations
  6. beyonddevelopments.ae
  7. beyonddevelopments.ae: Soulever
  8. beyonddevelopments.ae: Kanyon
  9. beyonddevelopments.ae: Forest
  10. danubeproperties.com: Oceanz
  11. damacproperties.com: Harbour lights de grisogono geneve
  12. damacproperties.com: Chelsea residences
  13. deyaar.ae: Mar casa
  14. koraprop.com: Ilvento
  15. prestigeone.ae: Hilton residences dubai maritime city
  16. web.khda.gov.ae: Schools
  17. Dubai Land Department: Service charge index overview
  18. Dubai Land Department: Rental index
  19. Dubai Legislation Portal: Decree No. (43) of 2013
  20. UAE Government portal: Expatriates buying a property in the UAE

What we could not verify

  • No RERA-approved service charge for a residential tower in Dubai Maritime City was available to us, because most towers are not yet complete; the guide gives no per-square-foot figure and tells buyers to ask for the developer's estimate and check the Service Charge Index once the building is registered.
  • No official average rent for Dubai Maritime City was obtained from the Dubai Land Department rental index, which returns results per building and unit; the guide gives no rent figures.
  • The ownership type of homes on the peninsula (freehold or a long lease) was not confirmed from a land department or Trakhees document; the guide tells buyers to confirm it for their unit with the developer.

4 Nov 2026 · Reviewed by OffPlan Insider Research. First published 4 Nov 2026, updated 6 Nov 2026. Data: home sizes, handover dates and starting prices are from OffPlan Insider project data in November 2026; the project table updates as projects are added.

Want options that fit your budget?

Tell us your budget and what the property is for. We check live prices, plans and availability with the developers and send the options that fit.

  1. Share your budgetAnd what the property is for
  2. We check with developersPrices, plans and availability
  3. You reserve directBooking and SPA are with the developer

No consultation fee · You book directly with the developer