Dubai approves AED 2bn Metro extension to Al Maktoum Airport City and a DLD study of 365,000 new homes
Dubai's Executive Council has approved a 3 km Route 2020 extension with two stations, due in 2031, and an AED 9.59bn plan for community services to 2040. A Dubai Land Department study puts residential occupancy at 97%.
2 min
News · Transport & infrastructure
Sharjah opens first phase of new road links to Dubai at Al Taawun Interchange
The first phase opened on 4 November with a partial opening of Al Taawun Interchange and new bridges from Sheikh Mohammed bin Zayed Road towards Expo Centre Sharjah. The full project covers about 9.2 km of road.
2 min
News · Transport & infrastructure
Dubai approves AED 2 billion plan for 48 urban centres around Metro stations
The Executive Council's Urban Centres Development Plan aims to add AED 20 billion to property values in the targeted areas by 2040 and raise the share of residents living near a Metro station from 52% to 74%.
2 min
News · Transport & infrastructure
E-911: the UAE's fourth federal highway, from the Dubai–Sharjah border to Ras Al Khaimah, moves to design
The Ministry of Energy and Infrastructure has asked consultants to bid for the design of a 68 km road with 12 to 16 lanes and an 8 km link to Emirates Road in Umm Al Quwain. Bids close on 23 October.
2 min
News · Transport & infrastructure
First Al Khail Street: Dubai's 15 km elevated road beside Sheikh Zayed Road moves to the contractor stage
The RTA is procuring the corridor on a design-and-build basis. Approved in July, it will serve Al Barsha, Al Quoz, Business Bay and Meydan, with construction from the third quarter of 2027 to the end of 2030.
1 min
News · Transport & infrastructure
Dubai has AED 2.1 trillion of projects under way, with AED 1.1 trillion of real estate and 350,000 homes
Sheikh Mohammed set out the pipeline at the Mohammed bin Rashid Leadership Forum: homes to 2030, Al Maktoum International, the Blue and Gold Metro lines, DIFC Phase 2 and new drainage and power networks.
2 min
News · Transport & infrastructure
Dubai's new addressing system: Makani numbers and QR codes on every house plate by 2030
New street signs and house number plates will be rolled out across 186 areas, starting this quarter in Za'abeel, Nad Al Sheba, Al Khawaneej 1 and Nazwa.
2 min
Developer announcement · Transport & infrastructure
Dubai Islands: Nakheel to upgrade 3 km of shoreline and add a new beach by the end of 2027
The marine works on Island B include new breakwaters and 320 metres of new beach beside Bay Villas. Completion is due in the fourth quarter of 2027.
1 min
News · Transport & infrastructure
Skylight Mall: Dubai Retail to open a 360-store mall on Al Khail Road in 2027
The mall will have 1.3 million sq ft of shops, dining and entertainment, and sits beside Jumeirah Village Triangle, Jumeirah Islands and The Springs.
1 min
News · Transport & infrastructure
Fourth Corridor: the 80 km Sharjah–Dubai–Abu Dhabi highway developers are planning around
Announced in September 2026, the UAE's fourth inter-emirate road axis will be built in two phases. Reportage says it has a 750,000 sqm site near the route with about 3,800 homes in design.
1 min
News · Transport & infrastructure
Etihad Rail opens Dubai station at Jumeirah Golf Estates: Abu Dhabi in about an hour
Passenger trains between Dubai's Al Yalayis Station and Abu Dhabi's Mohamed Bin Zayed City began on 30 September 2026, with five daily services and fares from AED 39.
2 min
New guides and the market report, by email.
About once a month. No listings spam, and you can leave any time.
Thanks. You're on the list.
OffPlan InsiderFree shortlist · No consultation fee